- Institution
- 경기도 광주시
- Department
- 건설과
○부연교 교량확장공사 150,000,000원
Programme 하천유지관리
Amounts and period
- Budgeted amount
- 150,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 17,762,328,000 KRW0.8%
-
Policy 자연친화적 하천관리운영 17,702,703,000 KRW0.8%
-
Programme 자연과어우러진시민휴식공간조성 13,118,894,000 KRW1.1%
-
Project 하천유지관리 2,184,639,000 KRW6.9%
-
Budget category 시설비및부대비 1,830,000,000 KRW8.2%
-
Statistical item 시설비 1,830,000,000 KRW8.2%
-
Item ○부연교 교량확장공사 150,000,000원 150,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
11 items- ○부연교 교량확장공사 150,000,000원 150,000,000 KRW Opens in a new window
- ○하천유지관리 장비임차료 300,000,000원 300,000,000 KRW Opens in a new window
- ○공익신고 보상금 상환금 3,675,000원 3,675,000 KRW Opens in a new window
- ○(소)하천(호안,제방등) 시설물 유지보수 1,000,000,000 KRW Opens in a new window
- ○지방하천 유지관리 사업(도비) 200,000,000 KRW Opens in a new window
- ○궁뜰천 상류부 하상보강 20,000,000원 20,000,000 KRW Opens in a new window
- ○부항천 정비사업 60,000,000원 60,000,000 KRW Opens in a new window
- ○목현천 인도설치공사 150,000,000원 150,000,000 KRW Opens in a new window
- ○신촌천 제방정비사업 100,000,000원 100,000,000 KRW Opens in a new window
- ○내선천 정비사업 50,000,000원 50,000,000 KRW Opens in a new window
- ○곤지암천 여울 조성공사 100,000,000원 100,000,000 KRW Opens in a new window
Data source
-
Open source PDF
경기도 광주시 · FY2018 본예산 · 통합회계 · 2018년_당초일반_및기타특별회계_세입세출예산서
Opens in a new window
- Page
- 392 / 649
View source document details
- Document ID
doc_6812b7n2j11mdban8drqgzgf7y- Source document status
- Available
- File type
- application/pdf
- File size
- 10,226.963 KiB
- Location inside the source
- Page 392 Row 8 Line 10 Column level4
Source and reference
FY 2018 release No source record
- Fiscal year of record
- 2018
- Fetched from the source
- 2026-07-29 20:07
- Read and interpreted
- 2026-07-29 20:07
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_03nh0gfc51r1nrcbb9r558wrfw- Address of this item
- /en/BudgetDetail/Item/bi_03nh0gfc51r1nrcbb9r558wrfw
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “교량확장공사” · classification 401-01
- ○귀여1리 교량확장공사 30,000,000원*1식 30,000,000 KRW
- ◎궁평2리 교량확장공사 50,000,000원 50,000,000 KRW
- ◎궁평2리 교량확장공사 50,000,000원 50,000,000 KRW
- ㅇ모정1리 교량확장공사 20,000,000원 40,000,000 KRW
- ○귀여1리 교량확장공사 29,229,000원*1식 29,229,000 KRW −2.6%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.