- Institution
- 인천광역시 강화군
- Department
- 양사면
○북성2리(458번지 일원) 농로 재포장공사(L=60m,B=3m)
Programme 마을안길 및 농로정비공사
Amounts and period
- Budget amount
- 20,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 양사면 1,697,918,000 KRW1.2%
-
Policy 양사면 사업경비 1,523,361,000 KRW1.3%
-
Programme 지역사회개발 917,080,000 KRW2.2%
-
Project 마을안길 및 농로정비공사 510,000,000 KRW3.9%
-
Budget category 시설비및부대비 510,000,000 KRW3.9%
-
Statistical item 시설비 510,000,000 KRW3.9%
-
Item ○북성2리(458번지 일원) 농로 재포장공사(L=60m,B=3m) 20,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○북성2리(458번지 일원) 농로 재포장공사(L=60m ,B=3m) 20,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
12 items- ○북성2리(458번지 일원) 농로 재포장공사(L=60m,B=3m) 20,000,000 KRW Opens in a new window
- ○철산리(5-2번지 일원 외 4개소) 가드레일 설 25,000,000 KRW Opens in a new window
- ○철산리(278-1번지 일원) 마을안길 정비공사(L =85m,B=1m,H=2m) 55,000,000 KRW Opens in a new window
- ○철산리(668-5번지 일원) 농로 포장공사(L=400m) 65,000,000 KRW Opens in a new window
- ○덕하1리(1261-8번지 일원) 농로 포장공사(L=55m) 20,000,000 KRW Opens in a new window
- ○덕하3리(534-2번지 일원) 마을안길 아스콘 재포장공사(L=550m,B=3m) 65,000,000 KRW Opens in a new window
- ○북성1리(571-2번지 일원) 아스콘 포장공사(L=410m,B=3m) 45,000,000 KRW Opens in a new window
- ○북성1리(1380-1번지 일원) 농로 재포장공사(L=60m,B=2m) 15,000,000 KRW Opens in a new window
- ○북성2리(623번지 일원) 농로 확포장공사(L=50m,B=0.5m) 10,000,000 KRW Opens in a new window
- ○교산1리(1037번지 일원) 마을안길 확포장공사(L=100m,B=1~1.5m) 70,000,000 KRW Opens in a new window
- ○교산2리(151번지 일원) 농로 및 용수관로 정 85,000,000 KRW Opens in a new window
- ○인화1리(105번지 일원) 농로 재포장공사(L=130m,B=4m) 35,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_24cz578k14nkdtswyndk7c848g- Source document status
- Available
- File type
- application/pdf
- File size
- 7,407.089 KiB
- Location inside the source
- Page 733 Row 8 Line 17 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:11
- Read and interpreted
- 2026-07-29 19:11
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_04mwh2wgw2z7ctx84dbe83j7ak- Address of this item
- /en/BudgetDetail/Item/bi_04mwh2wgw2z7ctx84dbe83j7ak
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “458번지” · classification 401-01
AI analysis report
AI analysis reports are not yet available.