- Institution
- 충청북도 충주시
- Department
- 도로과
○공사비
Programme 엄정 탄방마을 도로확포장
Amounts and period
- Budget amount
- 700,000,000 KRW
- 기정액
- 100,000,000 KRW
- Change
- +600,000,000 KRW +600.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 75,682,931,000 KRW0.9%
-
Policy 도로건설 68,714,420,000 KRW1.0%
-
Programme 농촌도로 관리 7,357,000,000 KRW9.5%
-
Project 엄정 탄방마을 도로확포장 700,000,000 KRW100.0%
-
Budget category 시설비및부대비 700,000,000 KRW100.0%
-
Statistical item 시설비 700,000,000 KRW100.0%
-
Item ○공사비 700,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
충청북도 충주시 · FY2026 Supplementary budget (round unknown) · 일반회계 · 2026년도 제1회 세입세출 추경예산서
Opens in a new window
- Page
- 213 / 612
View source document details
- Document ID
doc_7fzfw3f3keemrs13vqp6pqza66- Source document status
- Available
- File type
- application/pdf
- File size
- 9,304.315 KiB
- Location inside the source
- Page 213 Row 5 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 20:39
- Read and interpreted
- 2026-07-29 20:39
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_09gnzvxz7axkdnfe5yxwx0vs3s- Address of this item
- /en/BudgetDetail/Item/bi_09gnzvxz7axkdnfe5yxwx0vs3s
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “공사비” · classification 401-01
- ○공사비 경정 4,500,000,000원 4,500,000,000 KRW 0.0%
- ○공사비 경정 1,762,000,000원 1,762,000,000 KRW 0.0%
- ◎공사비 499,000,000원 499,000,000 KRW −5.3%
- ○공사비(자체) 6,100,000,000원 6,100,000,000 KRW
- ○공사비 1,800,000,000원 1,800,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.