- Institution
- 전북특별자치도 익산시
- Department
- 농산과
○ 여산면 노동마을 관정개발
Programme 한발대비 용수개발
Amounts and period
- Budgeted amount
- 50,000,000 KRW
- 기정액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 농산과 32,170,200,000 KRW0.2%
-
Policy 농촌환경 및 기반시설정비 16,418,166,000 KRW0.3%
-
Programme 농업기반시설정비 6,412,166,000 KRW0.8%
-
Project 한발대비 용수개발 150,000,000 KRW33.3%
-
Budget category 시설비및부대비 150,000,000 KRW33.3%
-
Statistical item 시설비 150,000,000 KRW33.3%
-
Item ○ 여산면 노동마을 관정개발 50,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
View source document details
- Document ID
doc_23k5tw4eae6szems2g5wnv6gv0- Source document status
- Available
- File type
- application/pdf
- File size
- 170.059 KiB
- Location inside the source
- Page 6 Row 5 Line 2 Column level4
Source and reference
FY 2014 release No source record
- Fiscal year of record
- 2014
- Fetched from the source
- 2026-07-28 16:49
- Read and interpreted
- 2026-07-28 16:49
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_0cfr9958nmam0v8zdmady770kz- Address of this item
- /en/BudgetDetail/Item/bi_0cfr9958nmam0v8zdmady770kz
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “노동마을” · classification 401-01
- ◎노동마을 아스콘 덧씌우기(L=400m,B=3m) 24,750,000 KRW
- ◎두서 인보(1158-9) 노동마을 구거정비공사 50,000,000 KRW
- ○상사면 노동마을 석흥천 수초 및 잡목제거 15,000,000 KRW
- ○노동마을 용배수로 정비공사 20,000,000 KRW
- ○갈산 노동마을 석축 설치(L=40m, H=2m) 25,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.