- Institution
- 충청남도 홍성군
- Department
- 갈산면
◎노동마을 콘크리트 포장(B=3m, L=80m)
Programme 소규모 주민 숙원 사업 추진
Amounts and period
- Budgeted amount
- 30,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 갈산면 2,046,270,000 KRW1.5%
-
Policy 갈산면 주민숙원사업 361,000,000 KRW8.3%
-
Programme 소규모 주민숙원사업 처리 361,000,000 KRW8.3%
-
Project 소규모 주민 숙원 사업 추진 260,000,000 KRW11.5%
-
Budget category 시설비및부대비 260,000,000 KRW11.5%
-
Statistical item 시설비 260,000,000 KRW11.5%
-
Item ◎노동마을 콘크리트 포장(B=3m, L=80m) 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
30,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
9 items- ◎노동마을 콘크리트 포장(B=3m, L=80m) 30,000,000 KRW Opens in a new window
- ◎구성마을 대기차선 설치(B=2m, L=110m) 20,000,000 KRW Opens in a new window
- ◎쌍천마을 콘크리트 포장(B=3m, L=110m) 30,000,000 KRW Opens in a new window
- ◎목과마을 배수로 정비(1000C, L=240m) 20,000,000 KRW Opens in a new window
- ◎사천마을 콘크리트 포장(B=3m, L=150m) 35,000,000 KRW Opens in a new window
- ◎취생마을 콘크리트 포장 및 안길정비(H=2.5m, B=2m, L=100m) 15,000,000 KRW Opens in a new window
- ◎갈산 신기마을 농로포장 30,000,000 KRW Opens in a new window
- ◎갈산 운정마을 아스콘 덧씌우기 30,000,000 KRW Opens in a new window
- ◎소규모 생활민원 처리 50,000,000원 50,000,000 KRW Opens in a new window
Data source
-
Open source PDF
충청남도 홍성군 · FY2025 본예산 · 일반회계 · 50-02. 세출예산 사업명세서(갈산면)
Opens in a new window
- Page
- 5 / 8
View source document details
- Document ID
doc_5nmqdpzd06b4epnpygpyrs6g8v- Source document status
- Available
- File type
- application/pdf
- File size
- 129.302 KiB
- Location inside the source
- Page 5 Row 9 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 19:03
- Read and interpreted
- 2026-07-29 19:03
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_0fnxhcp41f08308gf8zajm68ws- Address of this item
- /en/BudgetDetail/Item/bi_0fnxhcp41f08308gf8zajm68ws
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “노동마을” · classification 401-01
- ◎노동마을 아스콘 덧씌우기(L=400m,B=3m) 24,750,000 KRW
- ○갈산 노동마을 농로 확포장(L=215m, B=3.0m) 22,835,000 KRW
- ○갈산 노동마을 아스콘덧씌우기(L=370m,B=7.0~10m) 53,612,000 KRW
- ◎갈산 노동마을 아스콘덧씌우기(L=200M, B=4M) 13,000,000 KRW
- ○갈산 노동마을 석축 설치(L=40m, H=2m) 25,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.