- Institution
- 부산광역시 금정구
- Department
- 토지정보과
-오라클 400,400원*12월
Programme 토지종합정보망 유지
Amounts and period
- Budget amount
- 4,805,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Year-on-year change |
|---|---|---|
| FY2026 | 4,805,000 KRW Selected | 0 KRW |
| FY2025 | 4,805,000 KRW | 0 KRW |
| FY2024 | 4,805,000 KRW | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 토지정보과 1,935,965,000 KRW0.2%
-
Policy 체계적인 선진 지적행정 구현 1,864,887,000 KRW0.3%
-
Programme 토지정보의 효율적 관리 및 제공 1,496,930,000 KRW0.3%
-
Project 토지종합정보망 유지 26,225,000 KRW18.3%
-
Budget category 일반운영비 26,225,000 KRW18.3%
-
Statistical item 공공운영비 26,225,000 KRW18.3%
-
Item ○토지종합정보망 유지보수비용(S/W,H/W) 26,225,000 KRW18.3%
-
Calculation line -오라클 400,400원*12월 4,805,000 KRW
- Category–statistical code
- 201-02
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
부산광역시 금정구 · FY2026 본예산 · 일반회계 · 060_2026년본예산 2026년 본예산_29
Opens in a new window
- Page
- 2 / 6
-
Open source PDF
부산광역시 금정구 · FY2026 본예산 · 일반회계 · 030_2026년본예산 2026년 본예산_14
Opens in a new window
- Page
- 172 / 426
- Document ID
doc_0a1s7ajhkpthfevkx1sg8hgez1- Source document status
- Available
- File type
- application/pdf
- File size
- 113.278 KiB
- Location inside the source
- Page 2 Row 17 Line 5 Column level4
- Document ID
doc_2egnczsh7yry9d8cf49bmcc963- Source document status
- Available
- File type
- application/pdf
- File size
- 4,147.751 KiB
- Location inside the source
- Page 172 Row 17 Line 5 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 12:19
- Read and interpreted
- 2026-07-29 12:19
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_0g98v5b02w9s5mk2smfyyfcjr1- Address of this item
- /en/BudgetDetail/Item/bi_0g98v5b02w9s5mk2smfyyfcjr1
Related records
Similar budgets
5 itemsKeyword “오라클” · classification 201-02
- ㅇ공간정보시스템 오라클 유지보수비 57,435,000 KRW
- ○오라클 유지보수 2,660,000 KRW
- ○전산업무시스템 DB(오라클) 유지보수 17,892,000 KRW
- ○데이터베이스프로그램(오라클) 유지보수 21,772,000 KRW
- ―오라클 82,346,000원*8% 6,588,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.