- Institution
- 전북특별자치도 익산시
- Department
- 도로관리과
○중앙지하차도 인명대피시설 설치공사 (추경성립전예산편성)
Programme 지하차도 및 지하보도, 육교등 유지관리
Amounts and period
- Budget amount
- 400,000,000 KRW
- 기정액
- 0 KRW
- Change
- +400,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로관리과 13,895,158,000 KRW2.9%
-
Policy 도로환경개선 11,195,057,000 KRW3.6%
-
Programme 시설물 유지관리 3,112,643,000 KRW12.9%
-
Project 지하차도 및 지하보도, 육교등 유지관리 1,161,600,000 KRW34.4%
-
Budget category 시설비및부대비 780,000,000 KRW51.3%
-
Statistical item 시설비 780,000,000 KRW51.3%
-
Item ○중앙지하차도 인명대피시설 설치공사 (추경성립전예산편성) 400,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○중앙지하차도 인명대피시설 설치공사 (추경성립전예산편성)
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
- Document ID
doc_27eq14p0z5njfam8qe0e3hhpw7- Source document status
- Available
- File type
- application/pdf
- File size
- 104.713 KiB
- Location inside the source
- Page 2 Row 15 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-11-14 06:16
- Read and interpreted
- 2026-11-14 06:16
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_0ja9fpsyw3n2ne64krveynhd3g- Address of this item
- /en/BudgetDetail/Item/bi_0ja9fpsyw3n2ne64krveynhd3g
Related records
Similar budgets
5 itemsKeyword “추경성립전예산편성” · classification 401-01
- ○소나무재선충병 긴급방제(추경성립전예산편성) 550,000,000 KRW
- ○목천동 713-13 농배수로 정비(추경성립전예산편성) 30,000,000 KRW
- ○국가하천(금강, 강경천) 유지관리 (추경성립전예산편성) 226,480,000 KRW +43.8%
- ○용성마을 과속단속장비 설치 (추경성립전예산편성) 80,000,000 KRW
- ○부송4지구~궁동초간 도로확장 및 선형개선공사(추경성립전예산편성) 200,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.