- Institution
- 충청북도 괴산군
- Department
- 건설교통과
○청안 욕동 소하천재해복구공사(L=280m)
Programme 7.16.~20. 소하천 재해복구(자체)
Amounts and period
- Budgeted amount
- 53,273,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설교통과 34,830,026,000 KRW0.2%
-
Policy 하천정비 11,235,643,000 KRW0.5%
-
Programme 재해복구사업 1,363,413,000 KRW3.9%
-
Project 7.16.~20. 소하천 재해복구(자체) 1,363,413,000 KRW3.9%
-
Budget category 시설비및부대비 1,363,413,000 KRW3.9%
-
Statistical item 시설비 1,363,413,000 KRW3.9%
-
Item ○청안 욕동 소하천재해복구공사(L=280m) 53,273,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
17 items- ○청안 욕동 소하천재해복구공사(L=280m) 53,273,000 KRW Opens in a new window
- ○괴산 대명 소하천재해복구공사(L=30m) 35,849,000 KRW Opens in a new window
- ○감물 성골 소하천재해복구공사(L=170m) 138,458,000 KRW Opens in a new window
- ○문광 옥성 소하천재해복구공사(L=20m) 21,983,000 KRW Opens in a new window
- ○청천 월문 소하천재해복구공사(L=20m) 17,586,000 KRW Opens in a new window
- ○청천 내후영 소하천재해복구공사(L=20m) 21,025,000 KRW Opens in a new window
- ○청천 신후평 소하천재해복구공사(L=25m) 21,983,000 KRW Opens in a new window
- ○청천 공림 소하천재해복구공사(L=80m) 78,002,000 KRW Opens in a new window
- ○청안 조강 소하천재해복구공사(L=30m) 261,480,000 KRW Opens in a new window
- ○청안 회룡 소하천재해복구공사(L=40m) 35,274,000 KRW Opens in a new window
- ○청안 탑동 소하천재해복구공사(L=140m) 127,934,000 KRW Opens in a new window
- ○청안 괴실 소하천재해복구공사(L=30m) 39,410,000 KRW Opens in a new window
- ○사리 삼거리 소하천재해복구공사(L=220m) 200,071,000 KRW Opens in a new window
- ○사리 송오 소하천재해복구공사(L=90m) 98,923,000 KRW Opens in a new window
- ○소수 수동 소하천재해복구공사(L=20m) 21,983,000 KRW Opens in a new window
- ○소수 지선2 소하천재해복구공사(L=80m) 80,265,000 KRW Opens in a new window
- ○불정 남창 소하천재해복구공사(L=100m) 109,914,000 KRW Opens in a new window
Data source
- Document ID
doc_6d2rtw64694a9a8k40pa09yvdm- Source document status
- Available
- File type
- application/pdf
- File size
- 233.389 KiB
- Location inside the source
- Page 16 Row 2 Line 10 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:13
- Read and interpreted
- 2026-07-29 19:13
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_0k62zace35g3rx06x652rdsca6- Address of this item
- /en/BudgetDetail/Item/bi_0k62zace35g3rx06x652rdsca6
Related records
Similar budgets
5 itemsKeyword “소하천재해복구공사” · classification 401-01
- ○청안 조강 소하천재해복구공사(L=30m) 261,480,000 KRW
- ○청안 괴실 소하천재해복구공사(L=30m) 경정 21,000,000 KRW −46.7%
- ○청안 회룡 소하천재해복구공사(L=40m) 35,274,000 KRW
- ○청안 탑동 소하천재해복구공사(L=140m) 127,934,000 KRW
- ○청안 괴실 소하천재해복구공사(L=30m) 경정 21,000,000 KRW −46.7%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.