- Institution
- 서울특별시
- Department
- 균형발전본부 동남권사업과
· 사전협상 선제적 가이드라인 마련용역
Programme 서울국제교류복합지구(코엑스~잠실운동장 일대) 민간부지 도시관리계획 수립
Amounts and period
- Budgeted amount
- 100,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 균형발전본부 동남권사업과 25,804,294,000 KRW0.4%
-
Policy 서울 국제교류복합지구 조성 25,736,432,000 KRW0.4%
-
Programme 서울 국제교류복합지구 공간계획 20,635,784,000 KRW0.5%
-
Project 서울국제교류복합지구(코엑스~잠실운동장 일대) 민간부지 도시관리계획 수립 327,000,000 KRW30.6%
-
Budget category 시설비및부대비 Present in the source but not extracted
-
Statistical item 시설비 100,000,000 KRW100.0%
-
Item ㅇ 시설비 100,000,000 KRW100.0%
-
Calculation line · 사전협상 선제적 가이드라인 마련용역 100,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
50,000,000원*2개소 = 100,000
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
-
Open source PDF
서울특별시 · FY2026 본예산 · 통합회계 · 6a2b6b70825778.23573870
Opens in a new window
- Page
- 16 / 26
- Document ID
doc_4v4genqpk4vqv4ckhvwj8vgje9- Source document status
- Available
- File type
- application/pdf
- File size
- 454.59 KiB
- Location inside the source
- Page 16 Row 10 Line 23 Column page_text
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:10
- Read and interpreted
- 2026-07-29 19:10
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_0zqd0gd0vh239t400kr3xn4rtq- Address of this item
- /en/BudgetDetail/Item/bi_0zqd0gd0vh239t400kr3xn4rtq
Related records
Similar budgets
4 itemsKeyword “가이드라인” · classification 401-01
- ㅇ 희망촌 정비 가이드라인 수립 50,000,000 KRW
- ㅇ 연차별 가로수 계획 가이드라인 수립 등 200,000,000 KRW
- ○여주시 공공디자인 진흥계획 및 가이드라인 재정비 용역 170,000,000 KRW
- □공사용 가림벽 디자인 가이드라인 개발 15,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.