- Institution
- 강원특별자치도 원주시
- Department
- 지정면
○월송2리 송호마을 농수로 정비공사(L=150m, B =3.0m)
Programme 지정면 주민숙원사업
Amounts and period
- Budgeted amount
- 20,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 지정면 550,706,000 KRW3.6%
-
Policy 지정면 사업 경비 324,410,000 KRW6.2%
-
Programme 지정면 소규모 주민숙원사업 324,410,000 KRW6.2%
-
Project 지정면 주민숙원사업 301,000,000 KRW6.6%
-
Budget category 시설비및부대비 301,000,000 KRW6.6%
-
Statistical item 시설비 300,000,000 KRW6.7%
-
Item ○월송2리 송호마을 농수로 정비공사(L=150m, B =3.0m) 20,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○월송2리 송호마을 농수로 정비공사(L=150m, B =3.0m) 20,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
18 items- ○월송2리 송호마을 농수로 정비공사(L=150m, B =3.0m) 20,000,000 KRW Opens in a new window
- ○간현1리 버들골 마을안길 덧씌우기 공사(L=150m, B=3.0m) 15,000,000 KRW Opens in a new window
- ○간현2리 웃말길 배수로 정비공사(L=300m, B=1.0m) 25,000,000 KRW Opens in a new window
- ○간현3리 간현동 농로포장공사(L=250m, B=3.0m) 25,000,000 KRW Opens in a new window
- ○간현4리 경장동 수로정비공사(L=150, B=1.0m) 15,000,000 KRW Opens in a new window
- ○판대1리 원대마을 배수로 정비공사(L=200m, B =0.6m) 20,000,000 KRW Opens in a new window
- ○판대2리 중구현 마을안길 포장공사(L=150m, B =3.0m) 20,000,000 KRW Opens in a new window
- ○안창1리 능촌 농로포장공사(L=150m, B=3.0m) 15,000,000 KRW Opens in a new window
- ○안창2리 수청동 마을안길 포장공사(L=150m, H =3.0m) 20,000,000 KRW Opens in a new window
- ○가곡2리 지촌 농로포장공사(L=150m, B=3.0m) 15,000,000 KRW Opens in a new window
- ○월송1리 월호동 농로 및 수로 정비공사(L=100m, B=3.0m) 15,000,000 KRW Opens in a new window
- ○월송3리 봉동들 농로포장공사(L=100m, B=3.0m) 20,000,000 KRW Opens in a new window
- ○월송4리 구미동 농로포장공사(L=100m, B=3.0m) 10,000,000 KRW Opens in a new window
- ○신평1리 마을안길 포장공사(L=100m, B=3.0m) 15,000,000 KRW Opens in a new window
- ○신평2리 저금어지 마을안길 포장공사(L=200m, B=3.0m) 20,000,000 KRW Opens in a new window
- ○신평3리 안터 마을안길 포장공사(L=100m, B=3.0m) 10,000,000 KRW Opens in a new window
- ○보통리 복금동 마을안길 및 수로 정비공사(L=150m,B=3.0m) 20,000,000 KRW Opens in a new window
- ○시설부대비 1,000,000원*1식 1,000,000 KRW Opens in a new window
Data source
-
Open source PDF
강원특별자치도 원주시 · FY2017 본예산 · 일반회계 · 2017 본예산 회계별 세입, 세출예산 사업명세서 읍·면·동 행정복지센터
Opens in a new window
- Page
- 13 / 82
- Document ID
doc_3ndb3ka1scxgjcc3sgrmmfh32r- Source document status
- Available
- File type
- application/pdf
- File size
- 1,037.35 KiB
- Location inside the source
- Page 13 Row 11 Line 21 Column level4
Source and reference
FY 2017 release No source record
- Fiscal year of record
- 2017
- Fetched from the source
- 2026-07-29 17:45
- Read and interpreted
- 2026-07-29 17:45
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_1056gjgdn57zdhm6081nsfhcb1- Address of this item
- /en/BudgetDetail/Item/bi_1056gjgdn57zdhm6081nsfhcb1
Related records
Similar budgets
5 itemsKeyword “월송2리” · classification 401-01
- ○월송2리 송호 마을안길 덧씌우기공사(L=300m, B=3.0m) 25,000,000 KRW
- ○월송2리 송호마을 수로 정비공사(L=200m, B=0.6m) 20,000,000 KRW
- ○월송2리(농협창고) 마을안길 정비공사(L=150m) 20,000,000 KRW
- ○월송2리 송호동 마을안길 덧씌우기(B=6.5m, L =185m) 25,000,000 KRW
- ○지정면 월송2리 1214번지 용수로 정비공사(L=110m) 50,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.