- Institution
- 경상남도 의령군
- Department
- 안전관리과
○국가하천유지보수사업(4대강-하천관리)
Programme 국가하천유지보수사업(4대강외-하천관리)
Amounts and period
- Budget amount
- 653,473,000 KRW
- 기정액
- 950,000,000 KRW
- Change
- −296,527,000 KRW −31.2%
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 1 | Year-on-year change |
|---|---|---|---|
| FY2026 | Amount unconfirmed | 653,473,000 KRW Selected | −125,527,000 KRW |
| FY2025 | Amount unconfirmed | 779,000,000 KRW | Not comparable |
| FY2023 | 397,600,000 KRW | 355,400,000 KRW | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 안전관리과 39,576,871,000 KRW1.7%
-
Policy 하천정비(국토및지역개발/수자원) 19,383,766,000 KRW3.4%
-
Programme 하천관리사업 19,383,766,000 KRW3.4%
-
Project 국가하천유지보수사업(4대강외-하천관리) 687,867,000 KRW95.0%
-
Budget category 시설비및부대비 653,473,000 KRW100.0%
-
Statistical item 시설비 653,473,000 KRW100.0%
-
Item ○국가하천유지보수사업(4대강-하천관리) 653,473,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
653,473,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
경상남도 의령군 · FY2026 1회 추경 · 의령군하천골재채취군직영사업운영관리특별회계 · 2026년 1회추경 첨부705481
Opens in a new window
- Page
- 13 / 16
- Document ID
doc_0wr49hex9ewgttpdxkpbw482jw- Source document status
- Available
- File type
- application/pdf
- File size
- 221.826 KiB
- Location inside the source
- Page 13 Row 10 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 12:18
- Read and interpreted
- 2026-07-29 12:18
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_146bedq6h7sembgjx00v40w48e- Address of this item
- /en/BudgetDetail/Item/bi_146bedq6h7sembgjx00v40w48e
Related records
Similar budgets
2 itemsKeyword “국가하천유지보수사업” · classification 401-01
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.