- Institution
- 경기도 연천군
- Department
- 전곡읍
○은대리 840-8번지 일원(석축쌓기 L=50m, H=2.5m)
Programme 은대리 840-8번지 일원 석축쌓기
Amounts and period
- Budget amount
- 23,000,000 KRW
- 기정액
- 30,000,000 KRW
- Change
- −7,000,000 KRW −23.3%
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 1 | Year-on-year change |
|---|---|---|---|
| FY2026 | Amount unconfirmed | 23,000,000 KRW Selected | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 전곡읍 1,538,998,000 KRW1.5%
-
Policy 전곡읍 사업경비 490,000,000 KRW4.7%
-
Programme 소규모 지역개발 490,000,000 KRW4.7%
-
Project 은대리 840-8번지 일원 석축쌓기 23,000,000 KRW100.0%
-
Budget category 시설비및부대비 23,000,000 KRW100.0%
-
Statistical item 시설비 23,000,000 KRW100.0%
-
Item ○은대리 840-8번지 일원(석축쌓기 L=50m, H=2.5m) 23,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
경정23,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 연천군 · FY2026 1회 추경 · 연천군2026년일반및특별회계 · 연천군 2026년 일반 및 특별회계 세입·세출 제1회 추가경정예산서
Opens in a new window
- Page
- 549 / 583
- Document ID
doc_4eyefdngmeh61n4ftrw767nnf8- Source document status
- Available
- File type
- application/pdf
- File size
- 2,546.082 KiB
- Location inside the source
- Page 549 Row 14 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 20:37
- Read and interpreted
- 2026-07-29 20:37
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_16h2aw2gn2vea6cenjbvehfe70- Address of this item
- /en/BudgetDetail/Item/bi_16h2aw2gn2vea6cenjbvehfe70
Related records
Similar budgets
5 itemsKeyword “석축쌓기” · classification 401-01
- ○은대리 840-8번지 일원(석축쌓기 L=50m, H=2.5m) 30,000,000 KRW
- ○석축쌓기(H=2.5) L=150.0m 50,000,000 KRW
- ○대곡마을 소하천 정비(석축쌓기 : L=23.0m(양안), H=3.0m) 30,000,000 KRW
- □ 양천동 하로윗고개길 석축쌓기 20,000,000 KRW
- □ 양천동 양곡길 일원 석축쌓기 20,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.