- Institution
- 경기도 화성시
- Department
- 철도트램과
○신분당선 연장(호매실~봉담)사전타당성 재조사 용역
Programme 신분당선 연장(호매실~봉담) 타당성 재조사 용역
Amounts and period
- Budget amount
- 150,000,000 KRW
- 기정액
- 0 KRW
- Change
- +150,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 철도트램과 6,770,692,000 KRW2.2%
-
Policy 시민안전을 우선하는 교통체계 및 교통편의시설 구축 6,737,032,000 KRW2.2%
-
Programme 광역교통망 구축 6,737,032,000 KRW2.2%
-
Project 신분당선 연장(호매실~봉담) 타당성 재조사 용역 150,000,000 KRW100.0%
-
Budget category 연구개발비 150,000,000 KRW100.0%
-
Statistical item 연구용역비 150,000,000 KRW100.0%
-
Item ○신분당선 연장(호매실~봉담)사전타당성 재조사 용역 150,000,000 KRW
- Category–statistical code
- 207-01
- Group
- Not provided in source
Original description
○신분당선 연장(호매실~봉담)사전타당성 재조 사 용역 150,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 화성시 · FY2020 본예산 · 일반회계 · U_IL201012130813021
Opens in a new window
- Page
- 401 / 699
- Document ID
doc_7r4h1hw84tcrmmq441nkdvtfp9- Source document status
- Available
- File type
- application/pdf
- File size
- 5,354.499 KiB
- Location inside the source
- Page 401 Row 19 Line 1 Column level4
Source and reference
FY 2020 release No source record
- Fiscal year of record
- 2020
- Fetched from the source
- 2026-07-29 20:13
- Read and interpreted
- 2026-07-29 20:13
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_18drqmg7psv8x1fgh3sxz2tn6m- Address of this item
- /en/BudgetDetail/Item/bi_18drqmg7psv8x1fgh3sxz2tn6m
Related records
Similar budgets
5 itemsKeyword “사전타당성” · classification 207-01
- ○사천진항 요트 육상계류장 사전타당성 및통합검토 용역 19,000,000 KRW
- ○리모델링 사전타당성 용역 22,000,000 KRW
- ○문학IC~공단고가교 지하도로 연장 사전타당성조사 용역 240,000,000 KRW
- ○서울3호선 연장 사전타당성 조사 400,000,000 KRW
- ○서울5호선 검단·김포 연장 사전타당성조사 용역 299,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.