onbudget

See Every Budget Together

Saved

Text and display settings

Your choices are saved in this browser and apply across onbudget.

Text and display size
Display mode
Institution
전북특별자치도 정읍시
Department
회계과

○ 조직개편에 따른 사무실 이전 및 정비공사

Programme 청사기능 관리

Amounts and period

Budget amount
20,000,000 KRW
전년도예산액
Present in the source but not extracted
Change
Not comparable

Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.

Original and supplementary budgets by year

These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.

Original and supplementary budgets by year
Year Original budget Year-on-year change
FY2025 20,000,000 KRW Selected Not comparable

Programme hierarchy and share

The selected item’s share of each parent budget, calculated from amounts in the same source document.

A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.

  1. Department 회계과 101,175,706,000 KRW
  2. Policy 건전재정 5,153,908,000 KRW
  3. Programme 청사운영 1,998,867,000 KRW
  4. Project 청사기능 관리 501,000,000 KRW
  5. Budget category 시설비및부대비 481,000,000 KRW
  6. Statistical item 시설비 481,000,000 KRW
  7. Item ○ 조직개편에 따른 사무실 이전 및 정비공사 20,000,000 KRW
Category–statistical code
401-01
Group
Not provided in source

Original description

20,000,000원

Institution and programme names are shown as the original Korean source text.

Detailed budget items

11 items
  1. ○ 조직개편에 따른 사무실 이전 및 정비공사 401-01 Page 8 Selected item 20,000,000 KRW Opens in a new window
  2. ○ 노후시설물 정비(건축,전기,소방,기계 등) 401-01 Page 7 90,000,000 KRW Opens in a new window
  3. ○ 청사 제3종시설물 정기안전점검 401-01 Page 7 30,000,000 KRW Opens in a new window
  4. ○ 시청사 외벽 등 보수 50,000,000원 401-01 Page 7 50,000,000 KRW Opens in a new window
  5. ○ 본관 노후텍스 등 교체 401-01 Page 7 50,000,000 KRW Opens in a new window
  6. ○ 본관 변압기 등 교체 50,000,000원 401-01 Page 7 50,000,000 KRW Opens in a new window
  7. ○ 읍면동 노후시설 등 보수 401-01 Page 7 100,000,000 KRW Opens in a new window
  8. ○ 의회관 1층 로비 냉난방기 설치 401-01 Page 7 14,000,000 KRW Opens in a new window
  9. ○ 전기차 화재대응용 소화설비 설치 401-01 Page 8 68,000,000 KRW Opens in a new window
  10. ○ 전자안내판 설치 401-01 Page 8 9,000,000 KRW Opens in a new window
  11. ○ 청사 노후 사무가구 등 개선에 따른 물품 구입 405-01 Page 8 20,000,000 KRW Opens in a new window

Data source

View source document details
Document ID
doc_56802t4mhjzpzy3zy27gc79b5p
Source document status
Available
File type
application/pdf
File size
239.329 KiB
Location inside the source
Page 8 Row 2 Line 5 Column level4
View source document details
Document ID
doc_4sr4v7n7va175ey5q6ncnfbbmz
Source document status
Available
File type
application/pdf
File size
9,731.368 KiB
Location inside the source
Page 158 Row 2 Line 5 Column level4

Source and reference

FY 2025 release No source record

Fiscal year of record
2025
Fetched from the source
2026-07-28 17:13
Read and interpreted
2026-07-28 17:13
Query snapshot refreshed
2026-11-16 11:44
Item ID
bi_19dvt0tn8a7n62djv605gcf7jh

Similar budgets

5 items
Items share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.

Keyword “조직개편에” · classification 401-01

These items were verified within a limited set of name search results.

Search related names

AI analysis report

AI analysis reports are not yet available.