- Institution
- 경기도 고양시
- Department
- 도로관리사업소 공사과
○설계비 5,000,000원
Programme 용두동(소로3-383호선) 보행자도로 개설공사
Amounts and period
- Budgeted amount
- 5,000,000 KRW
- 기정액
- 0 KRW
- Change
- +5,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로관리사업소 공사과 17,236,905,000 KRW0.0%
-
Policy 일반도로건설(교통및물류/도로) 11,653,000,000 KRW0.0%
-
Programme 도로개설 9,220,000,000 KRW0.1%
-
Project 용두동(소로3-383호선) 보행자도로 개설공사 90,000,000 KRW5.6%
-
Budget category 시설비및부대비 90,000,000 KRW5.6%
-
Statistical item 시설비 90,000,000 KRW5.6%
-
Item ○설계비 5,000,000원 5,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
경기도 고양시 · FY2023 1회 추경 · 통합회계 · 2023년도 제1회 추가경정예산서
Opens in a new window
- Page
- 331 / 442
- Document ID
doc_0sfx47ky6hg85b4c34y4vkeq63- Source document status
- Available
- File type
- application/pdf
- File size
- 10,568.579 KiB
- Location inside the source
- Page 331 Row 19 Line 2 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 20:22
- Read and interpreted
- 2026-07-29 20:22
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_1j2r7s795d2vv0387axwz59akr- Address of this item
- /en/BudgetDetail/Item/bi_1j2r7s795d2vv0387axwz59akr
Related records
Similar budgets
5 itemsKeyword “설계비” · classification 401-01
- ◎설계비 208,000,000원 208,000,000 KRW
- ○소공연장 설계비 38,000,000원 38,000,000 KRW
- ○골목길정비 설계비 20,000,000원 20,000,000 KRW
- ○설계비 21,000,000원 21,000,000 KRW
- ○설계비 50,000,000원 50,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.