- Institution
- 경상북도 성주군
- Department
- 선남면
○문방3리(종산)세천정비공사(L=80m)
Programme 소규모주민숙원사업(주민참여예산)
Amounts and period
- Budgeted amount
- 23,676,000 KRW
- 기정액
- 25,000,000 KRW
- Change
- −1,324,000 KRW −5.3%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 선남면 2,060,757,000 KRW1.1%
-
Policy 일선행정운영및주민생활편의구축 1,831,470,000 KRW1.3%
-
Programme 주민숙원사업 1,045,000,000 KRW2.3%
-
Project 소규모주민숙원사업(주민참여예산) 1,045,000,000 KRW2.3%
-
Budget category 시설비및부대비 1,045,000,000 KRW2.3%
-
Statistical item 시설비 1,045,000,000 KRW2.3%
-
Item ○문방3리(종산)세천정비공사(L=80m) 23,676,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
경정23,676,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
36 items- ○문방3리(종산)세천정비공사(L=80m) 23,676,000 KRW Opens in a new window
- ○용신1리(띠밭)마을안길정비공사(L=110m) 23,685,000 KRW Opens in a new window
- ○용신3리(오릿골)아스콘덧씌우기공사(L=100m) 19,306,000 KRW Opens in a new window
- ○도흥1리(신흥리)마을안길정비공사(L=80m) 23,328,000 KRW Opens in a new window
- ○도흥2리(내동)마을안길정비공사(L=100m) 23,483,000 KRW Opens in a new window
- ○도흥2리(삽실)배수로정비공사(L=80m) 24,406,000 KRW Opens in a new window
- ○도흥3리(도흥들)배수로정비공사(L=100m) 22,452,000 KRW Opens in a new window
- ○소학1리(다개)마을안길정비공사(L=90m) 8,236,000 KRW Opens in a new window
- ○소학2리(신송정)마을안길정비공사(L=120m) 23,444,000 KRW Opens in a new window
- ○도성리(못뚝)배수로정비공사(L=200m) 0 KRW Opens in a new window
- ○도성리(못뚝)농로포장공사(L=70m) 0 KRW Opens in a new window
- ○동암1리(동촌)농로정비공사(L=80m) 14,500,000 KRW Opens in a new window
- ○유서1리(유촌)배수로정비공사(L=70m) 19,141,000 KRW Opens in a new window
- ○유서2리(질매골)세천정비공사(L=70m) 28,186,000 KRW Opens in a new window
- ○취곡1리(취아대)마을안길정비공사(L=90m) 23,428,000 KRW Opens in a new window
- ○취곡2리(방아실)배수로정비공사(L=100m) 24,181,000 KRW Opens in a new window
- ○신부1리(관석)세천정비공사(L=100m) 18,384,000 KRW Opens in a new window
- ○신부1리(관석)배수로정비공사(L=70m) 9,700,000 KRW Opens in a new window
- ○신부1리(예마)세천정비공사(L=80m) 28,230,000 KRW Opens in a new window
- ○성원2리(토죽골)세천정비공사(L=50m) 23,114,000 KRW Opens in a new window
- ○문방1리(대방동)마을안길정비공사(L=110m) 0 KRW Opens in a new window
- ○문방2리(문포)농로정비공사(L=90m) 경정23,449,000원 23,449,000 KRW Opens in a new window
- ○관화1리(정화리)배수로정비공사(L=150m) 23,732,000 KRW Opens in a new window
- ○관화3리(말티)세천정비공사(L=75m) 22,777,000 KRW Opens in a new window
- ○명포1리(금은계)마을안길정비공사(L=80m) 17,687,000 KRW Opens in a new window
- ○명포2리(굴바대)배수로정비공사(L=70m) 16,545,000 KRW Opens in a new window
- ○용신3리(오릿골)용수로수문교체공사(1식) 10,000,000 KRW Opens in a new window
- ○도흥2리(삽실)배수로정비공사(L=70m) 23,000,000 KRW Opens in a new window
- ○도성리(마안골)아스콘덧씌우기공사(L=100m) 25,000,000 KRW Opens in a new window
- ○문방1리(대방동)배수로정비공사(L=100m) 25,000,000 KRW Opens in a new window
- ○신부2리(예마)마을안길정비공사(L=120m) 30,000,000 KRW Opens in a new window
- ○용신1리(띠밭)농로정비공사(L=90m) 30,000,000 KRW Opens in a new window
- ○도흥3리(방천걸)농로정비공사(L=10m) 8,000,000 KRW Opens in a new window
- ○명포2리(송포)농로정비공사(L=120m) 22,000,000 KRW Opens in a new window
- ○아스콘원자재가격인상반영 16,930,000 KRW Opens in a new window
- ○소규모주민숙원사업긴급정비비(상하반기) 경정100,000,000원 100,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_3gbkzjv9wfxm8jxwmvsz7rwh7b- Source document status
- Available
- File type
- application/pdf
- File size
- 75.646 KiB
- Location inside the source
- Page 2 Row 2 Line 1 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-08-09 02:45
- Read and interpreted
- 2026-08-09 02:45
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_1pqa8b6k3memxtybmh072g9bq1- Address of this item
- /en/BudgetDetail/Item/bi_1pqa8b6k3memxtybmh072g9bq1
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “세천정비공사” · classification 401-01
- ○신부1리(예마)세천정비공사(L=80m) 28,230,000 KRW −5.9%
- ○광산2리(덕말리)세천정비공사(L=30m) 18,500,000 KRW −7.5%
- ○명천2리(오리들)세천정비공사(L=40m) 27,790,000 KRW −7.4%
- ○아미리 1007-4 세천정비공사(L=50m) 35,000,000 KRW
- ○유서2리(질매골)세천정비공사(L=70m) 28,186,000 KRW −6.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.