- Institution
- 경상남도 통영시
- Department
- 도시과
○봉평(신안제재소~구.21C조선)도시계획도로개설
Programme 봉평(신안제재소~구.21C조선)도시계획도로 개설
Amounts and period
- Budget amount
- 370,000,000 KRW
- 기정액
- 0 KRW
- Change
- +370,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도시과 10,596,451,000 KRW3.5%
-
Policy 지속가능한 도시기반조성(국토및지역개발/지역및도시) 9,804,540,000 KRW3.8%
-
Programme 도시계획도로개설 9,030,600,000 KRW4.1%
-
Project 봉평(신안제재소~구.21C조선)도시계획도로 개설 370,000,000 KRW100.0%
-
Budget category 시설비및부대비 370,000,000 KRW100.0%
-
Statistical item 시설비 370,000,000 KRW100.0%
-
Item ○봉평(신안제재소~구.21C조선)도시계획도로개설 370,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○봉평(신안제재소~구.21C조선)도시계획도로 개설
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
- Document ID
doc_06jn0rhd2h17phncmeqp2bsd0x- Source document status
- Available
- File type
- application/pdf
- File size
- 62.883 KiB
- Location inside the source
- Page 1 Row 18 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-11-14 06:03
- Read and interpreted
- 2026-11-14 06:03
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_1pycsf4z8tt4jgbbxqef6vh3eb- Address of this item
- /en/BudgetDetail/Item/bi_1pycsf4z8tt4jgbbxqef6vh3eb
Related records
Similar budgets
5 itemsKeyword “도시계획도로개설” · classification 401-01
- ◎옥암지구~홍성경찰서 교차로 도시계획도로개설 2,700,000,000 KRW 0.0%
- ○도시계획도로개설(남부권) 경정 0 KRW −100.0%
- ◎홍성 남장 승원팰리체 주변 도시계획도로개설 0 KRW −100.0%
- ○도시계획도로개설(향교~국도18호선) 경정 30,306,000 KRW −79.8%
- ○도시계획도로개설 시설결정 및 실시설계 용역 70,000,000 KRW +40.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.