- Institution
- 경기도 고양시
- Department
- 도로관리사업소 도로관리과
○공사비 331,000,000원
Programme 밤가시마을5단지 일원 등 2개소 도로정비공사
Amounts and period
- Budgeted amount
- 331,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로관리사업소 도로관리과 26,744,004,000 KRW1.2%
-
Policy 도로유지관리(교통및물류/도로) 13,463,868,000 KRW2.5%
-
Programme 도로관리(일산동구) 3,930,000,000 KRW8.4%
-
Project 밤가시마을5단지 일원 등 2개소 도로정비공사 350,000,000 KRW94.6%
-
Budget category 시설비및부대비 350,000,000 KRW94.6%
-
Statistical item 시설비 350,000,000 KRW94.6%
-
Item ○공사비 331,000,000원 331,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
경기도 고양시 · FY2022 본예산 · 통합회계 · 2022년 예산서 및 사업명세서
Opens in a new window
- Page
- 923 / 1,378
- Document ID
doc_37cqs997n5b14nr5ppdjbryxn6- Source document status
- Available
- File type
- application/pdf
- File size
- 21,703.702 KiB
- Location inside the source
- Page 923 Row 25 Line 2 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 18:27
- Read and interpreted
- 2026-07-29 18:27
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_1r0eh3awhp8csjcpq65vaawgwp- Address of this item
- /en/BudgetDetail/Item/bi_1r0eh3awhp8csjcpq65vaawgwp
Related records
Similar budgets
5 itemsKeyword “공사비” · classification 401-01
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 3,905,000,000원 3,905,000,000 KRW −5.1%
- ○공사비 935,000,000원 935,000,000 KRW
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 1,600,000,000원 1,600,000,000 KRW +433.3%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.