- Institution
- 대구광역시 달성군
- Department
- 기획예산과
○달성 농어촌관광휴양단지 개발사업 토지보상비 경정
Programme 달성농어촌관광휴양단지 개발사업
Amounts and period
- Budgeted amount
- 8,000,000,000 KRW
- 기정액
- 2,000,000,000 KRW
- Change
- +6,000,000,000 KRW +300.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 기획예산과 22,342,534,000 KRW35.8%
-
Policy 지역개발추진 15,823,210,000 KRW50.6%
-
Programme 전략사업추진 15,786,670,000 KRW50.7%
-
Project 달성농어촌관광휴양단지 개발사업 10,686,670,000 KRW74.9%
-
Budget category 시설비및부대비 10,686,670,000 KRW74.9%
-
Statistical item 시설비 10,686,670,000 KRW74.9%
-
Item ○달성 농어촌관광휴양단지 개발사업 토지보상비 경정 8,000,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○달성 농어촌관광휴양단지 개발사업 토지보 상비 경정 8,000,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
View source document details
- Document ID
doc_5g2zyxxwj374wpxab81nppbfx5- Source document status
- Available
- File type
- application/pdf
- File size
- 75.062 KiB
- Location inside the source
- Page 2 Row 2 Line 1 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 18:59
- Read and interpreted
- 2026-07-29 18:59
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_1r0ytzz8snt172et490pytqt11- Address of this item
- /en/BudgetDetail/Item/bi_1r0ytzz8snt172et490pytqt11
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “농어촌관광휴양단지” · classification 401-01
- ○달성 농어촌관광휴양단지 개발사업 토지보상비 경정 9,200,000,000 KRW +15.0%
- ○달성 농어촌관광휴양단지 개발사업 토지보상비 2,000,000,000 KRW
- ○달성 농어촌관광휴양단지 개발사업 토지보상비 6,000,000,000 KRW
- ○ 블랙밸리CC 제2골프장 조성 농어촌관광휴양단지 기본계획 용역(폐광기금) 350,000,000 KRW
- ○ 블랙밸리CC 제2골프장 조성 농어촌관광휴양단지 기본계획 용역(폐광기금) 327,000,000 KRW −6.6%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.