- Institution
- 경기도 광주시
- Department
- 도로사업과
○성남~광주간(지방도338호선)도로확포장공사경정
Programme 성남~광주간(지방도338호선)도로 확포장공사
Amounts and period
- Budget amount
- 550,000,000 KRW
- 기정액
- 500,000,000 KRW
- Change
- +50,000,000 KRW +10.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로사업과 110,844,251,000 KRW0.5%
-
Policy 도로건설사업 103,279,473,000 KRW0.5%
-
Programme 지방도로사업 15,891,000,000 KRW3.5%
-
Project 성남~광주간(지방도338호선)도로 확포장공사 10,041,000,000 KRW5.5%
-
Budget category 시설비및부대비 10,041,000,000 KRW5.5%
-
Statistical item 감리비 550,000,000 KRW100.0%
-
Item ○성남~광주간(지방도338호선)도로확포장공사경정 550,000,000 KRW
- Category–statistical code
- 401-02
- Group
- Not provided in source
Original description
○성남~광주간(지방도338호선)도로확포장공사 경정 550,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
경기도 광주시 · FY2017 3회 추경 · 통합회계 · 2017년_제3회_추가경정_일반_및_기타특별회계_세입세출예산서
Opens in a new window
- Page
- 184 / 267
View source document details
- Document ID
doc_2ep8px2f1nxsfqfmft75jt9jz1- Source document status
- Available
- File type
- application/pdf
- File size
- 59,351.724 KiB
- Location inside the source
- Page 184 Row 8 Line 1 Column level4
Source and reference
FY 2017 release No source record
- Fiscal year of record
- 2017
- Fetched from the source
- 2026-07-29 20:05
- Read and interpreted
- 2026-07-29 20:05
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_1vyxpm8repv0kwq4704t41c8hx- Address of this item
- /en/BudgetDetail/Item/bi_1vyxpm8repv0kwq4704t41c8hx
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도로확포장공사경정” · classification 401-02
- ○수기~분천간 도로확포장공사경정 250,000,000 KRW +150.0%
- ○수기~분천간 도로확포장공사경정 400,000,000 KRW +100.0%
- ○당하~오일간 도로확포장공사경정 670,000,000 KRW +168.0%
- ○동학~벌말간 도로확포장공사경정 460,000,000 KRW +76.9%
- ○수기~분천간 도로확포장공사경정 190,000,000 KRW +375.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.