- Institution
- 인천광역시 강화군
- Department
- 하점면
○부근1리(748-53번지 일원) 석축 재설치공사(L=40m,H=2.5~3m)
Programme 마을안길(농로) 정비
Amounts and period
- Budgeted amount
- 90,000,000 KRW
- 기정액
- 0 KRW
- Change
- +90,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 하점면 2,322,028,000 KRW3.9%
-
Policy 하점면 사업경비 2,100,266,000 KRW4.3%
-
Programme 지역사회개발 1,403,000,000 KRW6.4%
-
Project 마을안길(농로) 정비 1,030,000,000 KRW8.7%
-
Budget category 시설비및부대비 1,030,000,000 KRW8.7%
-
Statistical item 시설비 1,030,000,000 KRW8.7%
-
Item ○부근1리(748-53번지 일원) 석축 재설치공사(L=40m,H=2.5~3m) 90,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○부근1리(748-53번지 일원) 석축 재설치공사(L= 40m,H=2.5~3m) 90,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
6 items- ○부근1리(748-53번지 일원) 석축 재설치공사(L=40m,H=2.5~3m) 90,000,000 KRW Opens in a new window
- ○장정2리(1101번지 일원) 아스콘 포장공사(L=580m,B=4.2m) 70,000,000 KRW Opens in a new window
- ○창후2리(315-4번지 일원) 마을안길 포장공사(L=100m,B=3m) 30,000,000 KRW Opens in a new window
- ○이강2리(1147-1번지 일원) 아스콘 포장공사(L=150m,B=4.5m) 30,000,000 KRW Opens in a new window
- ○이강3리(13-2번지 일원) 마을안길 포장공사(L =250m,B=3.2~3.5m) 35,000,000 KRW Opens in a new window
- ○이강3리(284-1번지 일원) 마을안길 재포장공사(L=340m,B=3m) 40,000,000 KRW Opens in a new window
Data source
- Document ID
doc_3kevt719wgm0dmzgzmcnmh6nxm- Source document status
- Available
- File type
- application/pdf
- File size
- 1,229.67 KiB
- Location inside the source
- Page 115 Row 7 Line 4 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-08-09 02:47
- Read and interpreted
- 2026-08-09 02:47
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_1zc92kszvbka4sh285cbzhxvx1- Address of this item
- /en/BudgetDetail/Item/bi_1zc92kszvbka4sh285cbzhxvx1
Related records
Similar budgets
5 itemsKeyword “재설치공사” · classification 401-01
- ○쌍동리 농수로 수로관 재설치공사(224번지 일원) 20,000,000 KRW
- ○쌍동리 농수로 수로관 재설치공사(224번지 일원) 경정 19,816,000 KRW −0.9%
- ○영송리(389-1번지) 석축 재설치공사 18,841,000 KRW
- ○영송리(389-1번지) 석축 재설치공사 17,435,000 KRW −7.5%
- ㅇ백운면 방학2리 소교량 재설치공사(L=10m)(성립전,특별조정교부금) 1,000,000,000 KRW +25.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.