- Institution
- 전라남도 진도군
- Department
- 환경수질과
○나배도~관사도 도서식수원 개발사업경정
Programme 나배도~관사도 해저관로 설치공사
Amounts and period
- Budgeted amount
- 772,234,000 KRW
- 기정액
- 2,072,234,000 KRW
- Change
- −1,300,000,000 KRW −62.7%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 환경수질과 34,847,603,000 KRW2.2%
-
Policy 지방상수도 확충 및 마을상수도 관리 2,966,547,000 KRW26.0%
-
Programme 상수도시설 확충 및 관리 1,567,234,000 KRW49.3%
-
Project 나배도~관사도 해저관로 설치공사 772,234,000 KRW100.0%
-
Budget category 시설비및부대비 772,234,000 KRW100.0%
-
Statistical item 시설비 772,234,000 KRW100.0%
-
Item ○나배도~관사도 도서식수원 개발사업경정 772,234,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○나배도~관사도 도서식수원 개발사업 경정 772,234,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
View source document details
- Document ID
doc_3bznk72r4dbt03xvwv61820e06- Source document status
- Available
- File type
- application/pdf
- File size
- 231.459 KiB
- Location inside the source
- Page 12 Row 9 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-08-19 16:35
- Read and interpreted
- 2026-08-19 16:35
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_20ey8ay74hwxkjm4871wtmpy95- Address of this item
- /en/BudgetDetail/Item/bi_20ey8ay74hwxkjm4871wtmpy95
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “개발사업경정” · classification 401-01
- ○남양 장덕리 일원 대형관정 개발사업경정 46,250,000 KRW −7.5%
- ○송산동 일원 대형관정 개발사업경정 46,250,000 KRW −7.5%
- ○향남 백토리 일원 대형관정 개발사업경정 46,250,000 KRW −7.5%
- ○송산 천등리 일원 대형관정 개발사업경정 46,250,000 KRW −7.5%
- ○팔탄 기천리 대형관정 개발사업경정 46,250,000 KRW −7.5%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.