- 충청북도 충주시
- Department
- 도로과
○공사비 L=240m
Programme 동량면 조동리 도시계획도로개설(소로1-10호선)
Amounts and period
- Budgeted amount
- 100,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 66,575,242,000 KRW0.2%
-
Policy 도로건설 60,931,798,000 KRW0.2%
-
Programme 도시계획도로 관리 31,604,620,000 KRW0.3%
-
Project 동량면 조동리 도시계획도로개설(소로1-10호선) 100,000,000 KRW100.0%
-
Budget category 시설비및부대비 100,000,000 KRW100.0%
-
Statistical item 시설비 100,000,000 KRW100.0%
-
Item ○공사비 L=240m 100,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
충청북도 충주시 · FY2025 본예산 · 통합회계 · 1권 2025년 세입세출예산서(충주시)
Opens in a new window
- Page
- 310 / 1,254
- Document ID
doc_2cgha12sr20p74ewdhe9q3zyfn- Source document status
- Available
- File type
- application/pdf
- File size
- 10,572.47 KiB
- Location inside the source
- Page 310 Row 20 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:36
- Read and interpreted
- 2026-07-29 20:36
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_20j9p34j282j2rcb2et6r5wv07- Address of this item
- /en/BudgetDetail/Item/bi_20j9p34j282j2rcb2et6r5wv07
Related records
Similar budgets
5 itemsKeyword “공사비” · classification 401-01
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 3,905,000,000원 3,905,000,000 KRW −5.1%
- ○공사비 935,000,000원 935,000,000 KRW
- ○ 새천년 해안도로 해파랑 감성공원 조성 공사비 2,302,000,000 KRW −17.9%
- ○공사비 478,652,000원 478,652,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.