- Institution
- 경기도 양주시
- Department
- 안전건설과
○2022년 지방하천 수해복구사업(8.8~17)(성립전)
Programme 2022년 지방하천 수해복구사업(8.8~17)
Amounts and period
- Budgeted amount
- 510,344,000 KRW
- 기정액
- 0 KRW
- Change
- +510,344,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 안전건설과 16,903,232,000 KRW3.0%
-
Policy 하천정비 10,778,698,000 KRW4.7%
-
Programme 하천유지관리사업 10,778,698,000 KRW4.7%
-
Project 2022년 지방하천 수해복구사업(8.8~17) 510,344,000 KRW100.0%
-
Budget category 시설비및부대비 510,344,000 KRW100.0%
-
Statistical item 시설비 510,344,000 KRW100.0%
-
Item ○2022년 지방하천 수해복구사업(8.8~17)(성립전) 510,344,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○2022년 지방하천 수해복구사업(8.8~17)(성립 전) 510,344,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 양주시 · FY2022 3회 추경 · 통합회계 · ★2022년 3회 추경 예산서
Opens in a new window
- Page
- 273 / 541
- Document ID
doc_70j5gvaxkghjgwfbpg7k4e2dem- Source document status
- Available
- File type
- application/pdf
- File size
- 5,562.431 KiB
- Location inside the source
- Page 273 Row 15 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 20:19
- Read and interpreted
- 2026-07-29 20:19
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_23mj4xcdb7z7t121bxxkgwpcrs- Address of this item
- /en/BudgetDetail/Item/bi_23mj4xcdb7z7t121bxxkgwpcrs
Related records
Similar budgets
5 itemsKeyword “수해복구사업” · classification 401-01
- ○(제11호 태풍 힌남노) 지방하천 수해복구사업 22,072,000 KRW
- ○합천 용암서원 묘정비 주변 수해복구사업(성립전) 52,442,000 KRW
- ○신천 자전거도로 수해복구사업(성립전) 7,150,000 KRW
- ○7.8.~19. 하천친수시설 수해복구사업(보조)(성립전예산) 96,835,000 KRW
- ○7.8.~19. 하천기본시설 수해복구사업(보조)(성립전예산) 389,614,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.