- Institution
- 강원특별자치도 삼척시
- Department
- 건설과
○ 군도9호선(조비동일원) 낙석방지시설 정비
Programme 도로안전시설 유지관리
Amounts and period
- Budgeted amount
- 200,000,000 KRW
- 기정액
- 400,000,000 KRW
- Change
- −200,000,000 KRW −50.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 124,211,342,000 KRW0.2%
-
Policy 도로건설 및 유지(수송및교통/도로) 73,485,648,000 KRW0.3%
-
Programme 관내도로정비 7,896,232,000 KRW2.5%
-
Project 도로안전시설 유지관리 1,358,000,000 KRW14.7%
-
Budget category 시설비및부대비 1,253,000,000 KRW16.0%
-
Statistical item 시설비 1,250,000,000 KRW16.0%
-
Item ○ 군도9호선(조비동일원) 낙석방지시설 정비 200,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
View source document details
- Document ID
doc_70dpexjfda4t4dh98mhf1vj9c0- Source document status
- Available
- File type
- application/pdf
- File size
- 266.371 KiB
- Location inside the source
- Page 2 Row 6 Line 2 Column level4
Source and reference
FY 2019 release No source record
- Fiscal year of record
- 2019
- Fetched from the source
- 2026-07-29 17:56
- Read and interpreted
- 2026-07-29 17:56
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2599qwhexnt4pscje6c8yq2ra1- Address of this item
- /en/BudgetDetail/Item/bi_2599qwhexnt4pscje6c8yq2ra1
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “낙석방지시설” · classification 401-01
- ○ 군도9호선(조비동일원) 낙석방지시설 정비 400,000,000 KRW
- ○ 둔달리(71-2번지 일원) 낙석방지시설 설치 30,000,000 KRW
- ○ 무건리 산51번지 일원 낙석방지시설 설치 사업 20,000,000 KRW
- ○ 하마읍리 산67-2번지 일원 낙석방지시설 설치공사 50,000,000 KRW
- ○ 무건리 산51번지 일원 낙석방지시설 설치사업 20,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.