- Institution
- 충청북도 옥천군
- Department
- 군서면
○오동1리 세천 정비공사(L=100m)
Programme 소규모주민숙원사업(군서면)
Amounts and period
- Budgeted amount
- 30,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 군서면 989,712,000 KRW3.0%
-
Policy 지역개발(군서면) 660,000,000 KRW4.5%
-
Programme 지역사회개발(군서면) 660,000,000 KRW4.5%
-
Project 소규모주민숙원사업(군서면) 310,000,000 KRW9.7%
-
Budget category 시설비및부대비 310,000,000 KRW9.7%
-
Statistical item 시설비 308,000,000 KRW9.7%
-
Item ○오동1리 세천 정비공사(L=100m) 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
13 items- ○오동1리 세천 정비공사(L=100m) 30,000,000 KRW Opens in a new window
- ◎소규모주민숙원사업 308,000,000 KRW Opens in a new window
- ○주민숙원사업 실시설계용역비 30,000,000 KRW Opens in a new window
- ○소규모시설 유지보수공사 30,000,000 KRW Opens in a new window
- ○동산리 농로 포장공사(L=200m) 23,000,000 KRW Opens in a new window
- ○평곡리 농로 포장공사(L=300m) 25,000,000 KRW Opens in a new window
- ○증산리 농로 포장공사(L=200m) 23,000,000 KRW Opens in a new window
- ○은행리 농로 및 배수로 정비공사(L=150m) 23,000,000 KRW Opens in a new window
- ○사양리 농로 및 세천 정비공사(L=150m) 28,000,000 KRW Opens in a new window
- ○상중리 농로 및 배수로 정비공사(L=100m) 26,000,000 KRW Opens in a new window
- ○오동2리 농로 및 배수로 정비공사(L=200m) 20,000,000 KRW Opens in a new window
- ○월전리 농로 정비공사(L=100m) 50,000,000 KRW Opens in a new window
- ◎소규모주민숙원사업 시설부대비 2,000,000 KRW Opens in a new window
Data source
-
Open source PDF
충청북도 옥천군 · FY2020 본예산 · 일반회계 · 사업명세서 일반회계 읍 면 군서면(세출예산서)
Opens in a new window
- Page
- 4 / 5
- Document ID
doc_6g7wkpt5adkv1n581hw77m7bav- Source document status
- Available
- File type
- application/pdf
- File size
- 135.531 KiB
- Location inside the source
- Page 4 Row 6 Line 10 Column level4
Source and reference
FY 2020 release No source record
- Fiscal year of record
- 2020
- Fetched from the source
- 2026-07-29 18:13
- Read and interpreted
- 2026-07-29 18:13
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2968r40s3jnhwpbwqjp5zedc0s- Address of this item
- /en/BudgetDetail/Item/bi_2968r40s3jnhwpbwqjp5zedc0s
Related records
Similar budgets
5 itemsKeyword “오동1리” · classification 401-01
- ○오동1리(무중골) 세천 정비공사(L=100m) 28,000,000 KRW
- ○오동1리 마을광장 및 세천 정비공사(L=100m) 30,000,000 KRW
- ○오동1리 배수로 정비공사(L=100m) 30,000,000 KRW
- ○오동1리 농로 및 배수로 정비공사(L=100m) 30,000,000 KRW
- ◎군서 오동1리 점말 세천정비공사(L=100m) 100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.