- Institution
- 충청북도 청주시
- Department
- 옥산면
◎호죽리 마을안길 도로덧씌우기공사(L=750m, B =3m)
Programme 소규모주민숙원사업
Amounts and period
- Budget amount
- 30,000,000 KRW
- 기정액
- 0 KRW
- Change
- +30,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 옥산면 2,806,874,000 KRW1.1%
-
Policy 지역개발 1,171,234,000 KRW2.6%
-
Programme 지역개발사업 1,171,234,000 KRW2.6%
-
Project 소규모주민숙원사업 1,054,056,000 KRW2.8%
-
Budget category 시설비및부대비 1,053,456,000 KRW2.8%
-
Statistical item 시설비 1,050,000,000 KRW2.9%
-
Item ◎호죽리 마을안길 도로덧씌우기공사(L=750m, B =3m) 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
◎호죽리 마을안길 도로덧씌우기공사(L=750m, B =3m) 30,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
4 itemsData source
- Document ID
doc_4h63ey92ds7rf7w8cy1bfs5apa- Source document status
- Available
- File type
- application/pdf
- File size
- 144.267 KiB
- Location inside the source
- Page 4 Row 8 Line 6 Column level4
Source and reference
FY 2020 release No source record
- Fiscal year of record
- 2020
- Fetched from the source
- 2026-07-29 18:13
- Read and interpreted
- 2026-07-29 18:13
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_2avcephp7eax6e5rm3fg1drbm0- Address of this item
- /en/BudgetDetail/Item/bi_2avcephp7eax6e5rm3fg1drbm0
Related records
Similar budgets
5 itemsKeyword “도로덧씌우기공사” · classification 401-01
- ○일야미마을 도로덧씌우기공사(L=250m, B=4m) 40,000,000 KRW
- ○장전마을(태장동 1949-1번지 일원) 도로덧씌우기공사(L=30m, B=5m) 35,000,000 KRW
- ○가치래미마을(가현동 226-1번지 일원) 도로덧씌우기공사(L=20m, B=5m) 30,000,000 KRW
- ◎환희리 혜능보육원 앞 도로덧씌우기공사(L=180m) 15,000,000 KRW
- ◎비하동 삼일아파트일원 도로덧씌우기공사(L=180m) 25,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.