- 경상남도 고성군
- Department
- 건설과
○군도7호선 외 1개소 도로측구정비공사
Programme 군도유지관리
Amounts and period
- Budgeted amount
- 100,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 34,831,431,000 KRW0.3%
-
Policy 도로건설 15,028,196,000 KRW0.7%
-
Programme 군도사업 3,388,000,000 KRW3.0%
-
Project 군도유지관리 500,000,000 KRW20.0%
-
Budget category 시설비및부대비 500,000,000 KRW20.0%
-
Statistical item 시설비 500,000,000 KRW20.0%
-
Item ○군도7호선 외 1개소 도로측구정비공사 100,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
5 items- ○군도7호선 외 1개소 도로측구정비공사 100,000,000 KRW Opens in a new window
- ◎군도유지관리사업 500,000,000 KRW Opens in a new window
- ○군도9호선 외 3개소 차선도색공사(L=25km) 100,000,000 KRW Opens in a new window
- ○군도16호선 외 2개소 안전시설물설치공사 100,000,000 KRW Opens in a new window
- ○군도13호선 외 2개소 아스콘덧씌우기공사(L =5km) 200,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_3dkkzf7he4mktvydkywn4gxt8r- Source document status
- Available
- File type
- application/pdf
- File size
- 362.133 KiB
- Location inside the source
- Page 9 Row 8 Line 5 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 12:08
- Read and interpreted
- 2026-07-29 12:08
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2d66tjdf1x6ygwzgc877jpqtxe- Address of this item
- /en/BudgetDetail/Item/bi_2d66tjdf1x6ygwzgc877jpqtxe
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도로측구정비공사” · classification 401-01
- ○농어촌도로(대가201) 외 1개소 도로측구정비공사 100,000,000 KRW
- ○농어촌도로(거류303) 외 1개소 도로측구정비공사 80,000,000 KRW
- ○농어촌도로(하이102) 외 1개소 도로측구정비공사 100,000,000 KRW
- ○농어촌도로(구만201) 외 1개소 도로측구정비공사 100,000,000 KRW
- ○농어촌도로(하일102)외 1개소 도로측구정비공사 경정 150,000,000 KRW +50.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.