- Institution
- 경기도 광주시
- Department
- 초월읍
○용수리 적사장 건축물 보수공사경정
Programme 지역관리
Amounts and period
- Budgeted amount
- 13,110,000 KRW
- 기정액
- 14,000,000 KRW
- Change
- −890,000 KRW −6.4%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 초월읍 2,618,559,000 KRW0.5%
-
Policy 대민행정서비스 1,316,348,000 KRW1.0%
-
Programme 주민자치기반강화 1,316,348,000 KRW1.0%
-
Project 지역관리 956,938,000 KRW1.4%
-
Budget category 시설비및부대비 161,462,000 KRW8.1%
-
Statistical item 시설비 161,462,000 KRW8.1%
-
Item ○용수리 적사장 건축물 보수공사경정 13,110,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○용수리 적사장 건축물 보수공사 경정 13,110,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
4 itemsData source
-
Open source PDF
경기도 광주시 · FY2025 3회 추경 · 통합회계 · 2025년 제3회 일반 및 기타 특별회계 세입세출 추가경정 예산서
Opens in a new window
- Page
- 432 / 525
View source document details
- Document ID
doc_2rm0a3nsp8avm0t5d42ytqrpdt- Source document status
- Available
- File type
- application/pdf
- File size
- 3,283.595 KiB
- Location inside the source
- Page 432 Row 20 Line 4 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:30
- Read and interpreted
- 2026-07-29 20:30
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2df3p3gw9sy4ac2d01ttwm75dm- Address of this item
- /en/BudgetDetail/Item/bi_2df3p3gw9sy4ac2d01ttwm75dm
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “보수공사경정” · classification 401-01
- ㅇ원천리양식장 시설 보수공사경정 140,000,000 KRW +40.0%
- ○하천둔치 노후시설물 보수공사경정 502,470,000 KRW −15.7%
- ○매표소.관리실 지붕누수 보수공사경정 3,861,000 KRW −22.8%
- ㅇ수영장 도장 및 보수공사경정 35,000,000 KRW +133.3%
- ○도로시설물 보수공사경정 1,460,000,000 KRW +32.7%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.