- Institution
- 대구광역시
- Department
- 도로과
○하빈 동곡~감문간 도로건설경정
Programme 하빈 동곡~감문간 도로건설
Amounts and period
- Budgeted amount
- 0 KRW
- 기정액
- 1,980,000,000 KRW
- Change
- −1,980,000,000 KRW −100.0%
A zero here is what the source recorded. Missing values are never folded into zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 196,198,011,000 KRW0.0%
-
Policy 도로기반확충 174,987,589,000 KRW0.0%
-
Programme 일반도로건설 및 확장 62,712,000,000 KRW0.0%
-
Project 하빈 동곡~감문간 도로건설 5,000,000 KRW0.0%
-
Budget category 시설비및부대비 5,000,000 KRW0.0%
-
Statistical item 시설비 0 KRW
-
Item ○하빈 동곡~감문간 도로건설경정 0 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○하빈 동곡~감문간 도로건설 경정 0원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
대구광역시 · FY2023 2회 추경 · 통합회계 · 2023_2회_추가경정_26-1_교통국(일반)
Opens in a new window
- Page
- 6 / 8
View source document details
- Document ID
doc_07me8s4cebke951vx9416pc5bc- Source document status
- Available
- File type
- application/pdf
- File size
- 118.18 KiB
- Location inside the source
- Page 6 Row 5 Line 2 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 18:38
- Read and interpreted
- 2026-07-29 18:38
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2jhanszj0mv04fdgeynmgg0nde- Address of this item
- /en/BudgetDetail/Item/bi_2jhanszj0mv04fdgeynmgg0nde
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도로건설경정” · classification 401-01
- ○월배초교~대천로간 도로건설경정 0 KRW −100.0%
- ○제3산단 도로건설경정 9,441,000,000 KRW −24.1%
- ○국가산업단지(2단계) 서편 도로건설경정 16,030,000,000 KRW +10.3%
- ○제3산단 도로건설경정 8,601,000,000 KRW −8.9%
- ○월곡로~대한방직간 도로건설경정 800,000,000 KRW +33.3%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.