- Institution
- 경기도 고양시
- Department
- 공사과
○공사비 250,000,000원
Programme 사리현IC주변(시도81호선 남측) 도로개설공사
Amounts and period
- Budgeted amount
- 250,000,000 KRW
- 기정액
- 0 KRW
- Change
- +250,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 공사과 13,019,798,000 KRW1.9%
-
Policy 일반도로건설(교통및물류/도로) 12,596,000,000 KRW2.0%
-
Programme 도로개설 10,863,000,000 KRW2.3%
-
Project 사리현IC주변(시도81호선 남측) 도로개설공사 250,000,000 KRW100.0%
-
Budget category 시설비및부대비 250,000,000 KRW100.0%
-
Statistical item 시설비 250,000,000 KRW100.0%
-
Item ○공사비 250,000,000원 250,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 고양시 · FY2025 1회 추경 · 통합회계 · 2025년 제1회 추가경정예산서(게시용)
Opens in a new window
- Page
- 287 / 378
- Document ID
doc_6qsdxeyx05zw3drv8dnd5y0pyq- Source document status
- Available
- File type
- application/pdf
- File size
- 8,398.011 KiB
- Location inside the source
- Page 287 Row 10 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:30
- Read and interpreted
- 2026-07-29 20:30
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2nqng1c3b90myzth0fg2hy0w2d- Address of this item
- /en/BudgetDetail/Item/bi_2nqng1c3b90myzth0fg2hy0w2d
Related records
Similar budgets
5 itemsKeyword “공사비” · classification 401-01
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 3,905,000,000원 3,905,000,000 KRW −5.1%
- ○공사비 935,000,000원 935,000,000 KRW
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 1,600,000,000원 1,600,000,000 KRW +433.3%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.