onbudget

See Every Budget Together

Saved

Text and display settings

Your choices are saved in this browser and apply across onbudget.

Text and display size
Display mode
Institution
강원특별자치도 원주시
Department
봉산동

○화실 도로변 전석쌓기공사(L=140m, B=1.8m)

Programme 봉산동 소규모 주민숙원사업

Amounts and period

Budget amount
39,200,000 KRW
전년도예산액
Present in the source but not extracted
Change
Not comparable

Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.

Original and supplementary budgets by year

These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.

Original and supplementary budgets by year
Year Original budget Year-on-year change
FY2014 39,200,000 KRW Selected Not comparable

Programme hierarchy and share

The selected item’s share of each parent budget, calculated from amounts in the same source document.

A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.

  1. Department 봉산동 529,905,000 KRW
  2. Policy 봉산동 사업경비 342,660,000 KRW
  3. Programme 봉산동 소규모 주민숙원사업 342,660,000 KRW
  4. Project 봉산동 소규모 주민숙원사업 300,000,000 KRW
  5. Budget category 시설비및부대비 300,000,000 KRW
  6. Statistical item 시설비 300,000,000 KRW
  7. Item ○화실 도로변 전석쌓기공사(L=140m, B=1.8m) 39,200,000 KRW
Category–statistical code
401-01
Group
Not provided in source

Original description

39,200,000원*1식

Institution and programme names are shown as the original Korean source text.

Detailed budget items

12 items
  1. ○화실 도로변 전석쌓기공사(L=140m, B=1.8m) 401-01 Page 2 Selected item 39,200,000 KRW Opens in a new window
  2. ○능골 아스콘 포장공사(L=500m, B=4.0m) 401-01 Page 2 20,000,000 KRW Opens in a new window
  3. ○번재 마을안길 아스콘 포장공사(L=120m, B=3.0m) 401-01 Page 2 17,200,000 KRW Opens in a new window
  4. ○번재 도수로 설치공사(L=70m, B=0.8m) 401-01 Page 2 19,600,000 KRW Opens in a new window
  5. ○일문이 농로 확,포장공사(L=100m, B=3.0m) 401-01 Page 2 15,000,000 KRW Opens in a new window
  6. ○못골 농수로 설치공사(L=250m, B=1.0m) 401-01 Page 2 25,000,000 KRW Opens in a new window
  7. ○유세골 농수로 설치공사(L=300m, B=1.0m) 401-01 Page 2 30,000,000 KRW Opens in a new window
  8. ○2통 서낭당 뒷편 농수로 설치공사(L=80m, B=1.0m) 401-01 Page 2 10,800,000 KRW Opens in a new window
  9. ○19통 골목길 인도블럭 교체공사(L=150m, B=5.0m) 401-01 Page 2 22,500,000 KRW Opens in a new window
  10. ○5통 농수로 설치공사(L=350m, B=1.0m) 401-01 Page 2 40,000,000 KRW Opens in a new window
  11. ○큰 늑달골 농수로 설치공사(L=400m, B=1.0m) 401-01 Page 2 40,700,000 KRW Opens in a new window
  12. ○2통 뒷골 농수로 설치공사(L=150m, B=1.0m) 401-01 Page 2 20,000,000 KRW Opens in a new window

Data source

View source document details
Document ID
doc_698cqtx1ne6vst8pbnfk5mwxc5
Source document status
Available
File type
application/pdf
File size
116.214 KiB
Location inside the source
Page 2 Row 7 Line 15 Column level4

Source and reference

FY 2014 release No source record

Fiscal year of record
2014
Fetched from the source
2026-07-29 17:27
Read and interpreted
2026-07-29 17:27
Query snapshot refreshed
2026-11-16 11:44
Item ID
bi_2nrr0wjedmrntgp3p9rvcaqnfg

Similar budgets

5 items
Items share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.

Keyword “전석쌓기공사” · classification 401-01

These items were verified within a limited set of name search results.

Search related names

AI analysis report

AI analysis reports are not yet available.