○화실 도로변 전석쌓기공사(L=140m, B=1.8m)
Programme 봉산동 소규모 주민숙원사업
Amounts and period
- Budget amount
- 39,200,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Year-on-year change |
|---|---|---|
| FY2014 | 39,200,000 KRW Selected | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 봉산동 529,905,000 KRW7.4%
-
Policy 봉산동 사업경비 342,660,000 KRW11.4%
-
Programme 봉산동 소규모 주민숙원사업 342,660,000 KRW11.4%
-
Project 봉산동 소규모 주민숙원사업 300,000,000 KRW13.1%
-
Budget category 시설비및부대비 300,000,000 KRW13.1%
-
Statistical item 시설비 300,000,000 KRW13.1%
-
Item ○화실 도로변 전석쌓기공사(L=140m, B=1.8m) 39,200,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
39,200,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
12 items- ○화실 도로변 전석쌓기공사(L=140m, B=1.8m) 39,200,000 KRW Opens in a new window
- ○능골 아스콘 포장공사(L=500m, B=4.0m) 20,000,000 KRW Opens in a new window
- ○번재 마을안길 아스콘 포장공사(L=120m, B=3.0m) 17,200,000 KRW Opens in a new window
- ○번재 도수로 설치공사(L=70m, B=0.8m) 19,600,000 KRW Opens in a new window
- ○일문이 농로 확,포장공사(L=100m, B=3.0m) 15,000,000 KRW Opens in a new window
- ○못골 농수로 설치공사(L=250m, B=1.0m) 25,000,000 KRW Opens in a new window
- ○유세골 농수로 설치공사(L=300m, B=1.0m) 30,000,000 KRW Opens in a new window
- ○2통 서낭당 뒷편 농수로 설치공사(L=80m, B=1.0m) 10,800,000 KRW Opens in a new window
- ○19통 골목길 인도블럭 교체공사(L=150m, B=5.0m) 22,500,000 KRW Opens in a new window
- ○5통 농수로 설치공사(L=350m, B=1.0m) 40,000,000 KRW Opens in a new window
- ○큰 늑달골 농수로 설치공사(L=400m, B=1.0m) 40,700,000 KRW Opens in a new window
- ○2통 뒷골 농수로 설치공사(L=150m, B=1.0m) 20,000,000 KRW Opens in a new window
Data source
- Document ID
doc_698cqtx1ne6vst8pbnfk5mwxc5- Source document status
- Available
- File type
- application/pdf
- File size
- 116.214 KiB
- Location inside the source
- Page 2 Row 7 Line 15 Column level4
Source and reference
FY 2014 release No source record
- Fiscal year of record
- 2014
- Fetched from the source
- 2026-07-29 17:27
- Read and interpreted
- 2026-07-29 17:27
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_2nrr0wjedmrntgp3p9rvcaqnfg- Address of this item
- /en/BudgetDetail/Item/bi_2nrr0wjedmrntgp3p9rvcaqnfg
Related records
Similar budgets
5 itemsKeyword “전석쌓기공사” · classification 401-01
- ○운계1리 가막골 일원 외 1개소 전석쌓기공사(L=100m, B=1.5~2.5m) 25,000,000 KRW
- ○용암2리 지차골길 일원 전석쌓기공사(H=1.5~2.5m, L=100m) 25,000,000 KRW
- ○ 원덕1리 전석쌓기공사(H=2.0m,L=40m) 13,174,000 KRW −22.5%
- ○운계1리 도장골 일원 전석쌓기공사(H=2.5~3.0m, L=55m) 20,000,000 KRW
- ○운계2리 수논골 일원 전석쌓기공사(L=50m, H=2.5~3.5m) 20,000,000 KRW
These items were verified within a limited set of name search results.