- Institution
- 경기도 하남시
- Department
- 회계과
○본청사 등 시청 환경개선공사경정
Programme 시청사 유지보수
Amounts and period
- Budgeted amount
- 320,000,000 KRW
- 기정액
- 230,000,000 KRW
- Change
- +90,000,000 KRW +39.1%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 회계과 78,854,687,000 KRW0.4%
-
Policy 청사 운영 12,707,965,000 KRW2.5%
-
Programme 효율적인 청사시설 관리 12,707,965,000 KRW2.5%
-
Project 시청사 유지보수 600,300,000 KRW53.3%
-
Budget category 시설비및부대비 595,300,000 KRW53.8%
-
Statistical item 시설비 595,300,000 KRW53.8%
-
Item ○본청사 등 시청 환경개선공사경정 320,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○본청사 등 시청 환경개선공사 경정 320,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 하남시 · FY2019 2회 추경 · 통합회계 · 2019년도 제2회 일반 및 기타특별회계 추가경정예산서
Opens in a new window
- Page
- 285 / 495
View source document details
- Document ID
doc_3wmx1d5qn17anfxefj5tj5tsw7- Source document status
- Available
- File type
- application/pdf
- File size
- 2,486.722 KiB
- Location inside the source
- Page 285 Row 18 Line 1 Column level4
Source and reference
FY 2019 release No source record
- Fiscal year of record
- 2019
- Fetched from the source
- 2026-07-29 20:10
- Read and interpreted
- 2026-07-29 20:10
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2pxgeg541gzf749ss94cggbrmv- Address of this item
- /en/BudgetDetail/Item/bi_2pxgeg541gzf749ss94cggbrmv
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “환경개선공사경정” · classification 401-01
- ◎ 무릉계곡 등산로 개설 등 환경개선공사경정 750,000,000 KRW +114.3%
- ○화수부두 회센터 환경개선공사경정 17,700,000 KRW −22.0%
- ○의원사무실 환경개선공사경정 166,013,000 KRW −2.3%
- ○ 백운유수지 체육시설 환경개선공사경정 0 KRW −100.0%
- ○교환실 및 기계실 환경개선공사경정 14,883,000 KRW −32.4%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.