- Institution
- 경상북도 울릉군
- Department
- 총무과
○저동2리 농로확포장공사(용바위골)
Programme 새마을주민숙원사업
Amounts and period
- Budgeted amount
- 69,300,000 KRW
- 기정액
- 0 KRW
- Change
- +69,300,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 총무과 11,720,132,000 KRW0.6%
-
Policy 지역사회개발 촉진 2,985,904,000 KRW2.3%
-
Programme 균형있는 지역개발 2,985,904,000 KRW2.3%
-
Project 새마을주민숙원사업 450,000,000 KRW15.4%
-
Budget category 시설비및부대비 450,000,000 KRW15.4%
-
Statistical item 시설비 446,210,000 KRW15.5%
-
Item ○저동2리 농로확포장공사(용바위골) 69,300,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
69,300,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
6 items- ○저동2리 농로확포장공사(용바위골) 69,300,000 KRW Opens in a new window
- ○저동2리 농로확포장공사 99,110,000원 99,110,000 KRW Opens in a new window
- ○사동1리 농로확포장공사(우정산업인근) 69,300,000 KRW Opens in a new window
- ○저동2리 농로확포장공사(용바위골) 700,000 KRW Opens in a new window
- ○저동2리 농로확포장공사 890,000원 890,000 KRW Opens in a new window
- ○사동1리 농로확포장공사(우정산업인근) 700,000 KRW Opens in a new window
Data source
- Document ID
doc_0xnr60e33vcq40wr3t46d2x4kx- Source document status
- Available
- File type
- application/pdf
- File size
- 5,941.248 KiB
- Location inside the source
- Page 153 Row 15 Line 1 Column level4
Source and reference
FY 2013 release No source record
- Fiscal year of record
- 2013
- Fetched from the source
- 2026-07-29 19:58
- Read and interpreted
- 2026-07-29 19:58
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2qetqg3rt9x82a4b309e2tjp0b- Address of this item
- /en/BudgetDetail/Item/bi_2qetqg3rt9x82a4b309e2tjp0b
Related records
Similar budgets
5 itemsKeyword “농로확포장공사” · classification 401-01
- ○저동2리 농로확포장공사 99,110,000원 99,110,000 KRW
- ○농로확포장공사(저동2리)(나리레일바이크사업대체) 284,160,000 KRW
- ○추산리 농로확포장공사 49,470,000원 49,470,000 KRW
- ○축산마을(변전소남측)농로확포장공사(L=350m, B=6m) 348,000,000 KRW
- ○사동1리 농로확포장공사(우정산업인근) 69,300,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.