- Institution
- 경기도 포천시
- Department
- 산림녹지과
○임도정비사업
Programme 임도정비 지원사업
Amounts and period
- Budgeted amount
- 0 KRW
- 기정액
- 1,000,000 KRW
- Change
- −1,000,000 KRW −100.0%
A zero here is what the source recorded. Missing values are never folded into zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 산림녹지과 10,552,419,000 KRW0.0%
-
Policy 산림과 함께 푸른 포천 조성 10,500,483,000 KRW0.0%
-
Programme 산림자원 육성 1,069,818,000 KRW0.0%
-
Project 임도정비 지원사업 Present in the source but not extracted
-
Budget category 시설비및부대비 0 KRW
-
Statistical item 시설부대비 0 KRW
-
Item ○임도정비사업 0 KRW
- Category–statistical code
- 401-03
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
-
Open source PDF
경기도 포천시 · FY2017 1회 추경 · 일반회계 · 2017년 1회 추경 안전건설국 산림녹지과
Opens in a new window
- Page
- 2 / 9
View source document details
- Document ID
doc_1fjehhvwehaq9c929cyza60487- Source document status
- Available
- File type
- application/pdf
- File size
- 194.054 KiB
- Location inside the source
- Page 2 Row 17 Line 1 Column level4
Source and reference
FY 2017 release No source record
- Fiscal year of record
- 2017
- Fetched from the source
- 2026-07-29 17:46
- Read and interpreted
- 2026-07-29 17:46
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2w5874hxb59veda89e2a729frz- Address of this item
- /en/BudgetDetail/Item/bi_2w5874hxb59veda89e2a729frz
Related records
Similar budgets
4 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “임도정비사업” · classification 401-03
- ○임도정비사업 1,000,000 KRW
- ◎임도정비사업 시설부대비경정 335,000 KRW −83.7%
- ○낙민1구 분토골 임도정비사업 324,000 KRW
- ○소규모 임도정비사업 900,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.