- Institution
- 경기도 의왕시
- Department
- 환경과
○비점오염저감시설 안전시설물 설치
Programme 비점오염원 저감
Amounts and period
- Budgeted amount
- 55,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 환경과 5,918,547,000 KRW0.9%
-
Policy 수질환경개선 375,732,000 KRW14.6%
-
Programme 비점오염원 관리 266,200,000 KRW20.7%
-
Project 비점오염원 저감 266,200,000 KRW20.7%
-
Budget category 시설비및부대비 105,000,000 KRW52.4%
-
Statistical item 시설비 105,000,000 KRW52.4%
-
Item ○비점오염저감시설 안전시설물 설치 55,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
5,000,000원*11개소
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
-
Open source PDF
경기도 의왕시 · FY2026 본예산 · 통합회계 · FY2026 예산서(경기 의왕시)
Opens in a new window
- Page
- 576 / 798
View source document details
- Document ID
doc_2yxgy6xvfb50ves6nm9yfkm7dy- Source document status
- Available
- File type
- application/pdf
- File size
- 4,265.093 KiB
- Location inside the source
- Page 576 Row 3 Line 4 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 20:37
- Read and interpreted
- 2026-07-29 20:37
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2wmg2xvq3avp4apak0rb86b5s4- Address of this item
- /en/BudgetDetail/Item/bi_2wmg2xvq3avp4apak0rb86b5s4
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “비점오염저감시설” · classification 401-01
- ○자안천 비점오염저감시설 설치사업 2,672,000,000 KRW
- ○비점오염저감시설 자연형(실개천) 배관 분기 공사 80,000,000 KRW
- ○비점오염저감시설 보수 30,000,000 KRW
- ○비점오염저감시설 유지관리 21,000,000 KRW
- ○비점오염저감시설 유지관리사업 50,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.