- Institution
- 충청북도 괴산군
- Department
- 건설교통과
○청안 참샘 소하천정비공사(L=40m) 경정
Programme 소하천 정비(전환사업)
Amounts and period
- Budgeted amount
- 50,000,000 KRW
- 기정액
- 28,000,000 KRW
- Change
- +22,000,000 KRW +78.6%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설교통과 45,403,468,000 KRW0.1%
-
Policy 하천정비 12,022,893,000 KRW0.4%
-
Programme 소하천 정비 5,201,920,000 KRW1.0%
-
Project 소하천 정비(전환사업) 2,043,000,000 KRW2.4%
-
Budget category 시설비및부대비 2,039,000,000 KRW2.5%
-
Statistical item 시설비 1,830,000,000 KRW2.7%
-
Item ○청안 참샘 소하천정비공사(L=40m) 경정 50,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○청안 참샘 소하천정비공사(L=40m) 경정 50,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
10 items- ○청안 참샘 소하천정비공사(L=40m) 경정 50,000,000 KRW Opens in a new window
- ○장연 거문 소하천정비공사(L=250m) 경정 150,000,000 KRW Opens in a new window
- ○문광 옥성 소하천정비공사(L=200m) 경정 158,000,000 KRW Opens in a new window
- ○장연 장암 소하천정비공사(L=240m) 50,000,000 KRW Opens in a new window
- ○장연 거문 소하천사면정비공사(L=80m) 100,000,000 KRW Opens in a new window
- ○문광 동막골 소하천정비공사(L=100m) 경정 40,000,000 KRW Opens in a new window
- ○불정 원삼방 소하천정비공사(L=60m) 50,000,000 KRW Opens in a new window
- ○불정 반능 소하천정비공사(L=110m) 40,000,000 KRW Opens in a new window
- ○소하천 정비사업 통합 감리경정 200,000,000 KRW Opens in a new window
- ○소하천 정비 시설부대비경정 9,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_6frs62fg5cnptzpnd16z3d53nz- Source document status
- Available
- File type
- application/pdf
- File size
- 186.491 KiB
- Location inside the source
- Page 10 Row 11 Line 10 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-08-09 02:51
- Read and interpreted
- 2026-08-09 02:51
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_2yrvsb06zgq0e0avtzwd32pmky- Address of this item
- /en/BudgetDetail/Item/bi_2yrvsb06zgq0e0avtzwd32pmky
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “소하천정비공사” · classification 401-01
- ○문광 동막골 소하천정비공사(L=100m) 경정 40,000,000 KRW −63.6%
- ○인정리 소하천정비공사(L=40m) 30,000,000 KRW
- ○장연 거문 소하천정비공사(L=250m) 경정 150,000,000 KRW −40.0%
- ○문광 옥성 소하천정비공사(L=200m) 경정 158,000,000 KRW −12.2%
- ○장연 장암 소하천정비공사(L=240m) 50,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.