- Institution
- 충청북도 옥천군
- Department
- 이원면
○대동리 마을광장 및 배수로정비공사 일부감
Programme 소규모주민숙원사업(이원면)
Amounts and period
- Budgeted amount
- 28,000,000 KRW
- 기정액
- 30,000,000 KRW
- Change
- −2,000,000 KRW −6.7%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 이원면 1,372,432,000 KRW2.0%
-
Policy 지역개발(이원면) 747,794,000 KRW3.7%
-
Programme 지역사회개발(이원면) 688,250,000 KRW4.1%
-
Project 소규모주민숙원사업(이원면) 426,250,000 KRW6.6%
-
Budget category 시설비및부대비 426,250,000 KRW6.6%
-
Statistical item 시설비 425,000,000 KRW6.6%
-
Item ○대동리 마을광장 및 배수로정비공사 일부감 28,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○대동리 마을광장 및 배수로정비공사 일부 감
Institution and programme names are shown as the original Korean source text.
Detailed budget items
12 items- ○대동리 마을광장 및 배수로정비공사 일부감 28,000,000 KRW Opens in a new window
- ◎소규모주민숙원사업 425,000,000 KRW Opens in a new window
- ○포동리 농로 및 배수로정비공사 일부감 28,000,000 KRW Opens in a new window
- ○구룡리 마을안길정비공사 일부감 28,000,000 KRW Opens in a new window
- ○지탄리 농로 및 배수로정비공사 일부감 28,000,000 KRW Opens in a new window
- ○백지리 배수로정비공사 일부감 28,000,000 KRW Opens in a new window
- ○장화리 농로 및 배수로정비공사 일부감 28,000,000 KRW Opens in a new window
- ○개심리 마을안길정비공사 일부감 38,000,000 KRW Opens in a new window
- ○수묵리 마을안길정비공사 일부감 38,000,000 KRW Opens in a new window
- ○강청1리 농로 및 배수로정비공사 일부감 28,000,000 KRW Opens in a new window
- ○칠방리 쓰레기장정비사업 일부감 23,000,000 KRW Opens in a new window
- ◎소규모주민숙원사업 시설부대비 일부감 1,250,000 KRW Opens in a new window
Data source
-
Open source PDF
충청북도 옥천군 · FY2026 1회 추경 · 일반회계 · 사업명세서 일반회계 읍 면 이원면(세출예산서)
Opens in a new window
- Page
- 3 / 3
View source document details
- Document ID
doc_6325g924tgxyzhvzx4e4n6z8n2- Source document status
- Available
- File type
- application/pdf
- File size
- 80.19 KiB
- Location inside the source
- Page 3 Row 3 Line 7 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:13
- Read and interpreted
- 2026-07-29 19:13
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_30j81g2kft9h3xcck6zhrvhcp5- Address of this item
- /en/BudgetDetail/Item/bi_30j81g2kft9h3xcck6zhrvhcp5
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “배수로정비공사” · classification 401-01
- ㅇ마동지구 농로 및 배수로정비공사 25,000,000 KRW
- ㅇ영등지구 농로 및 배수로정비공사 25,000,000 KRW
- ◎산포면 등정3리 도로재포장 및 측구 배수로정비공사 110,000,000 KRW
- ㅇ연산지구 농로 및 배수로정비공사 25,000,000 KRW
- ㅇ징광지구 농로 및 배수로정비공사 25,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.