- Institution
- 인천광역시 강화군
- Department
- 길상면
○길직2리 아스콘 덧씌우기 공사(L=700m, B=3.5m)
Programme 소규모지역개발(길상면 마을안길 정비공사)
Amounts and period
- Budgeted amount
- 40,000,000 KRW
- 기정액
- 0 KRW
- Change
- +40,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 길상면 2,380,620,000 KRW1.7%
-
Policy 길상면 사업경비 2,110,269,000 KRW1.9%
-
Programme 지역사회개발 1,585,560,000 KRW2.5%
-
Project 소규모지역개발(길상면 마을안길 정비공사) 430,000,000 KRW9.3%
-
Budget category 시설비및부대비 430,000,000 KRW9.3%
-
Statistical item 시설비 430,000,000 KRW9.3%
-
Item ○길직2리 아스콘 덧씌우기 공사(L=700m, B=3.5m) 40,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○길직2리 아스콘 덧씌우기 공사(L=700m, B=3.5 m) 40,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
7 items- ○길직2리 아스콘 덧씌우기 공사(L=700m, B=3.5m) 40,000,000 KRW Opens in a new window
- ○온수3리 해란부락 도로포장 및 수로관 설치(L =300m, B=4m, 수로관 1,000C) 100,000,000 KRW Opens in a new window
- ○초지1리(황산도) 마을안길 재포장 공사(L=400m, B=3m) 20,000,000 KRW Opens in a new window
- ○초지1리 밤나무골 도로개설 공사(L=60m, B=3m) 10,000,000 KRW Opens in a new window
- ○초지2리 마을안길 재포장공사(L=600m, B=4m) 40,000,000 KRW Opens in a new window
- ○길직1리 마을안길 포장공사(L=208m, B=3m) 30,000,000 KRW Opens in a new window
- ○길직2리 도로 확포장 공사(L=460m, B=4m) 50,000,000 KRW Opens in a new window
Data source
- Document ID
doc_75pn6rm0hjbjvznyjq9tvqgfsx- Source document status
- Available
- File type
- application/pdf
- File size
- 1,988.644 KiB
- Location inside the source
- Page 126 Row 2 Line 7 Column level4
Source and reference
FY 2019 release No source record
- Fiscal year of record
- 2019
- Fetched from the source
- 2026-07-29 18:01
- Read and interpreted
- 2026-07-29 18:01
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_32sndewmtmj9qzz92rb25vktdp- Address of this item
- /en/BudgetDetail/Item/bi_32sndewmtmj9qzz92rb25vktdp
Related records
Similar budgets
5 itemsKeyword “길직2리” · classification 401-01
AI analysis report
AI analysis reports are not yet available.