- Institution
- 경상북도 울진군
- Department
- 건설과
○부구천 정비사업(주인2리) 마무리공사(특별교부세 집행잔액 재투자)
Programme 부구천 정비사업(주인2리) 마무리공사
Amounts and period
- Budget amount
- 100,000,000 KRW
- 기정액
- 0 KRW
- Change
- +100,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 36,062,465,000 KRW0.3%
-
Policy 하천관리 2,004,580,000 KRW5.0%
-
Programme 지방하천 정비사업 2,004,580,000 KRW5.0%
-
Project 부구천 정비사업(주인2리) 마무리공사 100,000,000 KRW100.0%
-
Budget category 시설비및부대비 100,000,000 KRW100.0%
-
Statistical item 시설비 100,000,000 KRW100.0%
-
Item ○부구천 정비사업(주인2리) 마무리공사(특별교부세 집행잔액 재투자) 100,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○부구천 정비사업(주인2리) 마무리공사(특별교 부세 집행잔액 재투자)
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경상북도 울진군 · FY2022 1회 추경 · 일반회계 · 095_2022년예산서 행정·소식 2022년 예산서 제1회 추경예산 일반회계 세출예산 사업명세서 세출예산 사업명세서
Opens in a new window
- Page
- 187 / 253
- Document ID
doc_1kfgp9hxtxxfb93ymdebb6fvqv- Source document status
- Available
- File type
- application/pdf
- File size
- 3,593.804 KiB
- Location inside the source
- Page 187 Row 16 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 18:28
- Read and interpreted
- 2026-07-29 18:28
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_347j0r7abvehzmwpbj3wbbbvrb- Address of this item
- /en/BudgetDetail/Item/bi_347j0r7abvehzmwpbj3wbbbvrb
Related records
Similar budgets
5 itemsKeyword “마무리공사” · classification 401-01
- ○신림리 비례동 옹벽 마무리공사(L=60m) 30,000,000 KRW
- ◎무릉별유천지 진입도로 마무리공사 400,000,000 KRW
- ○학곡2리(동팔) 배수로 마무리공사 80,000,000 KRW
- ○외선미1리(안마) 마을배수로정비 마무리공사 150,000,000 KRW
- ○매화면 건강산책로조성 마무리공사 300,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.