- Institution
- 강원특별자치도 원주시
- Department
- 건설과
○단계동 종합청사사거리 지하차도 설치
Programme 지방채 상환(건설과)
Amounts and period
- Budgeted amount
- 300,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 24,611,833,000 KRW1.2%
-
Policy 재무활동(건설과) 1,427,000,000 KRW21.0%
-
Programme 보전지출(건설과) 1,427,000,000 KRW21.0%
-
Project 지방채 상환(건설과) 1,427,000,000 KRW21.0%
-
Budget category 차입금원금상환 1,400,000,000 KRW21.4%
-
Statistical item 시ㆍ군ㆍ구지역개발기금차입금원금상환 1,400,000,000 KRW21.4%
-
Item ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW
- Category–statistical code
- 601-01
- Group
- Not provided in source
Original description
300,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
6 items- ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW Opens in a new window
- ○단계동 종합청사사거리 지하차도 설치 4,500,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2010년) 10,500,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2011년) 12,000,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2010년) 700,000,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2011년) 400,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_3m7vm927cs0dgp8y76pbchr70j- Source document status
- Available
- File type
- application/pdf
- File size
- 123.063 KiB
- Location inside the source
- Page 5 Row 9 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 18:54
- Read and interpreted
- 2026-07-29 18:54
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_386z59cs7amab0czzg3jpmjkqk- Address of this item
- /en/BudgetDetail/Item/bi_386z59cs7amab0czzg3jpmjkqk
Related records
Similar budgets
4 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “종합청사사거리” · classification 601-01
- ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.