- Institution
- 충청북도 충주시
- Department
- 도로과
○공사비(L=0.5km)
Programme 소태면 군도17호선(구수고개) 선형개량사업
Amounts and period
- Budgeted amount
- 850,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 32,987,398,000 KRW2.6%
-
Policy 도로건설 28,659,900,000 KRW3.0%
-
Programme 도로 및 교량정비 9,461,840,000 KRW9.0%
-
Project 소태면 군도17호선(구수고개) 선형개량사업 850,000,000 KRW100.0%
-
Budget category 시설비및부대비 850,000,000 KRW100.0%
-
Statistical item 시설비 850,000,000 KRW100.0%
-
Item ○공사비(L=0.5km) 850,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
충청북도 충주시 · FY2022 본예산 · 일반회계 · 2022년 당초 예산서(고시)
Opens in a new window
- Page
- 296 / 1,381
- Document ID
doc_1b708wbvmaqbzsmw7rd9wnd7xs- Source document status
- Available
- File type
- application/pdf
- File size
- 10,132.701 KiB
- Location inside the source
- Page 296 Row 7 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 20:23
- Read and interpreted
- 2026-07-29 20:23
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_39hyhpc66sdrmwn909dht2qk7a- Address of this item
- /en/BudgetDetail/Item/bi_39hyhpc66sdrmwn909dht2qk7a
Related records
Similar budgets
5 itemsKeyword “공사비” · classification 401-01
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 3,905,000,000원 3,905,000,000 KRW −5.1%
- ○공사비 935,000,000원 935,000,000 KRW
- ○ 새천년 해안도로 해파랑 감성공원 조성 공사비 2,302,000,000 KRW −17.9%
- ○공사비 478,652,000원 478,652,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.