- Institution
- 경상북도 성주군
- Department
- 선남면
○명포1리조명설치공사(1식)
Programme 소규모주민숙원사업(주민참여예산)
Amounts and period
- Budget amount
- 17,597,000 KRW
- 기정액
- 20,000,000 KRW
- Change
- −2,403,000 KRW −12.0%
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 2 | Year-on-year change |
|---|---|---|---|
| FY2023 | Amount unconfirmed | 17,597,000 KRW Selected | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 선남면 2,037,770,000 KRW0.9%
-
Policy 일선행정운영및주민생활편의구축 1,813,628,000 KRW1.0%
-
Programme 주민숙원사업 1,154,019,000 KRW1.5%
-
Project 소규모주민숙원사업(주민참여예산) 1,154,019,000 KRW1.5%
-
Budget category 시설비및부대비 1,154,019,000 KRW1.5%
-
Statistical item 시설비 1,154,019,000 KRW1.5%
-
Item ○명포1리조명설치공사(1식) 17,597,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
경정17,596,800원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
34 items- ○명포1리조명설치공사(1식) 17,597,000 KRW Opens in a new window
- ○용신3리농로정비공사(L=100m) 20,000,000 KRW Opens in a new window
- ○도흥1리(신흥들)농로정비공사(L=150m) 28,526,000 KRW Opens in a new window
- ○도흥1리(배나실)농로정비공사(L=200m) 28,948,000 KRW Opens in a new window
- ○도흥2리(내동)배수로정비공사(L=150m) 19,008,000 KRW Opens in a new window
- ○도흥3리(방천걸)농로정비공사(L=150m) 29,225,000 KRW Opens in a new window
- ○소학2리배수로정비공사(L=150m) 27,626,000 KRW Opens in a new window
- ○도성리소하천정비공사(L=100m) 27,897,000 KRW Opens in a new window
- ○동암1리(동촌)농로정비공사(L=120m) 29,038,000 KRW Opens in a new window
- ○동암2리(신당리)농로정비공사(L=150m) 28,718,000 KRW Opens in a new window
- ○유서1리농로정비공사(1식) 21,535,000 KRW Opens in a new window
- ○유서2리배수로정비공사(L=100m) 22,805,000 KRW Opens in a new window
- ○취곡1리마을안길정비공사(L=100m) 23,194,000 KRW Opens in a new window
- ○신부1리마을안길정비공사(L=200m) 25,710,000 KRW Opens in a new window
- ○신부2리배수로정비공사(L=200m) 28,559,000 KRW Opens in a new window
- ○성원1리(황신)마을안길정비공사(1식) 29,199,000 KRW Opens in a new window
- ○성원2리(새원)농로정비공사(L=100m) 29,320,000 KRW Opens in a new window
- ○문방3리(종산)배수로정비공사(L=100m) 23,110,000 KRW Opens in a new window
- ○오도리마을안길정비공사(L=100m) 28,495,000 KRW Opens in a new window
- ○관화1리(관화들)배수로정비공사(L=150m) 19,957,000 KRW Opens in a new window
- ○관화2리마을안길정비공사(L=100m) 28,004,000 KRW Opens in a new window
- ○관화3리(말티)배수로정비공사(L=100m) 경정19,794,490원 19,795,000 KRW Opens in a new window
- ○명포2리배수로정비공사(1식) 25,421,000 KRW Opens in a new window
- ○장학리농로정비공사(L=150m) 28,046,000 KRW Opens in a new window
- ○선남면제방정비공사(L=150m) 24,652,000 KRW Opens in a new window
- ○가로등(보안등)설치(20개소) 19,634,000 KRW Opens in a new window
- ○용신3리(오릿골)배수로정비공사(1식) 10,000,000 KRW Opens in a new window
- ○선원2리(도원계)마을안길정비공사(1식) 20,000,000 KRW Opens in a new window
- ○신부1리(관석)배수로및농로정비공사(1식) 20,000,000 KRW Opens in a new window
- ○신부2리(신부들)농로확포장정비공사(1식) 30,000,000 KRW Opens in a new window
- ○관화3리(관화들)배수로정비공사(1식) 20,000,000 KRW Opens in a new window
- ○동암~도성제기성제정비공사(L=40m) 30,000,000 KRW Opens in a new window
- ○선남군유림법면긴급정비공사(L=40m) 20,000,000 KRW Opens in a new window
- ○소규모주민숙원사업긴급정비비(상하반기) 경정130,000,000원 130,000,000 KRW Opens in a new window
Data source
- Document ID
doc_5swxjntpvkbv5wnfz88nrg4y36- Source document status
- Available
- File type
- application/pdf
- File size
- 65.43 KiB
- Location inside the source
- Page 2 Row 2 Line 1 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 18:37
- Read and interpreted
- 2026-07-29 18:37
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_3a23tnppmgzegx4vv1tkqprr3g- Address of this item
- /en/BudgetDetail/Item/bi_3a23tnppmgzegx4vv1tkqprr3g
Related records
Similar budgets
Keyword “명포1리조명설치공사” · classification 401-01
No items with the same classification were found among the candidates checked.
AI analysis report
AI analysis reports are not yet available.