○운천1리 배수로 설치공사(L=150m,H=1000mm) 경정

Programme 지역개발사업

Amounts and period

Budget amount
44,023,000 KRW
기정액
45,500,000 KRW
Change
−1,477,000 KRW −3.2%

Original and supplementary budgets by year

These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.

Original and supplementary budgets by year
Year Original budget Supplementary 2 Year-on-year change
FY2014 Amount unconfirmed 44,023,000 KRW Selected Not comparable

Programme hierarchy and share

The selected item’s share of each parent budget, calculated from amounts in the same source document.

A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.

  1. Department 영북면 751,883,000 KRW
  2. Policy 사업경비(영북면) 649,923,000 KRW
  3. Programme 주민편익사업 350,000,000 KRW
  4. Project 지역개발사업 300,000,000 KRW
  5. Budget category 시설비및부대비 300,000,000 KRW
  6. Statistical item 시설비 300,000,000 KRW
  7. Item ○운천1리 배수로 설치공사(L=150m,H=1000mm) 경정 44,023,000 KRW
Category–statistical code
401-01
Group
Not provided in source

Original description

○운천1리 배수로 설치공사(L=150m,H=1000mm) 경정 44,023,000원

Institution and programme names are shown as the original Korean source text.

Detailed budget items

11 items
  1. ○운천1리 배수로 설치공사(L=150m,H=1000mm) 경정 401-01 Page 2 Selected item 44,023,000 KRW Opens in a new window
  2. ○운천3리 배수로 설치공사(L=190m,H=400mm) 경정 401-01 Page 2 19,076,000 KRW Opens in a new window
  3. ○운천4리 배수로 설치공사(L=100m,H=600mm) 경정 401-01 Page 2 16,207,000 KRW Opens in a new window
  4. ○운천5리 구거 생태블럭 설치공사(L=30m,H=2.5m) 경정 401-01 Page 2 18,421,000 KRW Opens in a new window
  5. ○운천8리 용배수로 설치공사(L=250m,H=600mm) 경정 401-01 Page 2 50,642,000 KRW Opens in a new window
  6. ○자일1리 하천 생태블럭 설치공사(L=60m,H=3.0m) 경정 401-01 Page 2 33,392,000 KRW Opens in a new window
  7. ○자일2리 배수로 및 우수관 설치공사(L=70m,H=1000mm) 경정 401-01 Page 2 32,760,000 KRW Opens in a new window
  8. ○자일3리 마을안길 도로 포장공사(L=70m,B=4m, t=20cm) 경정 401-01 Page 2 34,843,000 KRW Opens in a new window
  9. ○자일4리 우수관 설치공사(L=60m,D=600mm) 경정 401-01 Page 2 17,379,000 KRW Opens in a new window
  10. ○문암리 마을도로 포장공사(L=120m,B=4.0m) 경정 401-01 Page 2 16,565,000 KRW Opens in a new window
  11. ○대회산리 구거 석축 설치공사(H=3.0m,L=42m) 401-01 Page 2 16,692,000 KRW Opens in a new window

Data source

View source document details
Document ID
doc_7vy8ebm0wm29pry2yy9pq4ctpe
Source document status
Available
File type
application/pdf
File size
108.764 KiB
Location inside the source
Page 2 Row 7 Line 1 Column level4

Source and reference

FY 2014 release No source record

Fiscal year of record
2014
Fetched from the source
2026-07-29 17:28
Read and interpreted
2026-07-29 17:28
Query snapshot refreshed
2026-11-16 11:44
Item ID
bi_3bpfvg7nr6x7ga9ev3rx5t5eaf

Similar budgets

5 items
Items share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.

Keyword “1000mm” · classification 401-01

These items were verified within a limited set of name search results.

Search related names

AI analysis report

AI analysis reports are not yet available.