- Institution
- 경상남도 산청군
- Department
- 건설과
○군도23호선 둔철도로 배수로 정비공사
Programme 군도 정비사업
Amounts and period
- Budgeted amount
- 100,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 70,772,334,000 KRW0.1%
-
Policy 도로건설사업 19,001,269,000 KRW0.5%
-
Programme 군도정비사업 2,288,208,000 KRW4.4%
-
Project 군도 정비사업 2,288,208,000 KRW4.4%
-
Budget category 시설비및부대비 2,288,208,000 KRW4.4%
-
Statistical item 시설비 2,280,000,000 KRW4.4%
-
Item ○군도23호선 둔철도로 배수로 정비공사 100,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
100,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
11 items- ○군도23호선 둔철도로 배수로 정비공사 100,000,000 KRW Opens in a new window
- ○군도24호 신안마을 우회도로 개설공사(L=0.66km) 100,000,000 KRW Opens in a new window
- ○군도8호선 손항도로 법면보강공사 180,000,000 KRW Opens in a new window
- ○군도9호선 유평도로 정비공사 500,000,000 KRW Opens in a new window
- ○군도13호 대포지구 도로 정비공사 200,000,000 KRW Opens in a new window
- ○군도15호선(오봉지구) 법면보강공사 200,000,000 KRW Opens in a new window
- ○군도20호선 중산도로 법면보강공사 300,000,000 KRW Opens in a new window
- ○율현~척지간 도로(군도24호선) 아스콘덧씌우기공사(L=3km) 300,000,000 KRW Opens in a new window
- ○군도27호선 간공도로 배수로 정비공사 100,000,000 KRW Opens in a new window
- ○지막교 연결도로 정비사업 300,000,000 KRW Opens in a new window
- ○시설부대비 2,280,000,000원*0.36% 8,208,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_7pjnk6gqhtys4v8xg6w2rqc8cf- Source document status
- Available
- File type
- application/pdf
- File size
- 318.43 KiB
- Location inside the source
- Page 18 Row 7 Line 14 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 12:11
- Read and interpreted
- 2026-07-29 12:11
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_3c2g3rygmnhw07662qvt1vrfrt- Address of this item
- /en/BudgetDetail/Item/bi_3c2g3rygmnhw07662qvt1vrfrt
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “군도23호선” · classification 401-01
- ○연풍 원풍 군도23호선 배수로 및 사면정비(L =300m) 190,000,000 KRW
- ○군도23호선 배수로 정비 100,000,000원*1식 100,000,000 KRW
- ○군도23호선(번동)아스콘포장공사 120,000,000 KRW
- ○감천 덕율 회전교차로(군도23호선) 정비 100,000,000 KRW
- ○군도23호선(신암면계촌리)보도설치사업 100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.