- Institution
- 경상남도 통영시
- Department
- 도로과
○국도14호선(관문사거리~충무요양병원)보도 개설공사 실시설계용역
Programme 안전한보행환경조성사업
Amounts and period
- Budget amount
- 30,000,000 KRW
- 기정액
- 0 KRW
- Change
- +30,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 11,519,718,000 KRW0.3%
-
Policy 지역균형 발전과 쾌적한 도로환경 조성(교통및물류/도로) 9,559,718,000 KRW0.3%
-
Programme 자동차 교통관리 개선사업 2,477,800,000 KRW1.2%
-
Project 안전한보행환경조성사업 310,000,000 KRW9.7%
-
Budget category 시설비및부대비 300,000,000 KRW10.0%
-
Statistical item 시설비 300,000,000 KRW10.0%
-
Item ○국도14호선(관문사거리~충무요양병원)보도 개설공사 실시설계용역 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○국도14호선(관문사거리~충무요양병원)보도 개 설공사 실시설계용역
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
- Document ID
doc_0s2gmyx396hga4ahbcntbqx4ns- Source document status
- Available
- File type
- application/pdf
- File size
- 131.008 KiB
- Location inside the source
- Page 2 Row 15 Line 4 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 12:09
- Read and interpreted
- 2026-07-29 12:09
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_3dp3reyqe3c44wx0gzyzxk9mmb- Address of this item
- /en/BudgetDetail/Item/bi_3dp3reyqe3c44wx0gzyzxk9mmb
Related records
Similar budgets
5 itemsKeyword “국도14호선” · classification 401-01
- ○무전 원문고개~관문사거리 국도14호선 도로 140,000,000 KRW
- ◎마암 국도14호선 휴게소 화장실 설치 200,000,000 KRW
- ○용남 미늘고개 국도14호선 배수로 정비공사 20,000,000 KRW
- ○국도14호선 소나무 전정사업 30,000,000 KRW
- ○용남면 달포마을~국도14호선 연결도로 공사 300,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.