- Institution
- 경상남도 함안군
- Department
- 칠북면
○아산마을 과수농로 배수로 정비(L=120m, D =600mm)
Programme 소규모 주민편익사업
Amounts and period
- Budget amount
- 30,000,000 KRW
- 기정액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 1 | Year-on-year change |
|---|---|---|---|
| FY2026 | Amount unconfirmed | 30,000,000 KRW Selected | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 칠북면 1,365,392,000 KRW2.2%
-
Policy 주민숙원사업(국토및지역개발/지역및도시) 901,674,000 KRW3.3%
-
Programme 소규모 주민편익사업 901,674,000 KRW3.3%
-
Project 소규모 주민편익사업 901,674,000 KRW3.3%
-
Budget category 시설비및부대비 820,000,000 KRW3.7%
-
Statistical item 시설비 820,000,000 KRW3.7%
-
Item ○아산마을 과수농로 배수로 정비(L=120m, D =600mm) 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○아산마을 과수농로 배수로 정비(L=120m, D =600mm) 30,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
32 items- ○아산마을 과수농로 배수로 정비(L=120m, D =600mm) 30,000,000 KRW Opens in a new window
- ○재해응급복구 인부임 2,477,000 KRW Opens in a new window
- ○중대재해예방 배치전 건강진단 140,000 KRW Opens in a new window
- ○배수로 유지관리 중기임차료 40,000,000 KRW Opens in a new window
- ○꽃길조성 재료비(종자 및 퇴비) 2,000,000 KRW Opens in a new window
- ○소규모 위험시설 보수(상시) 50,000,000 KRW Opens in a new window
- ○농로 보수 및 정비(상시) 50,000,000원 50,000,000 KRW Opens in a new window
- ○농업용 지하수 보수(상시) 30,000,000 KRW Opens in a new window
- ○배수로 준설(상시) 20,000,000원 20,000,000 KRW Opens in a new window
- ○노거수 정비(상시) 20,000,000원 20,000,000 KRW Opens in a new window
- ○도로안전시설설치(상시) 20,000,000원 20,000,000 KRW Opens in a new window
- ○화천마을 농로 확장(L=50m, H=3m,B=2m→3m) 30,000,000 KRW Opens in a new window
- ○성호마을 안길 확장(L=100m,D=500mm) 30,000,000 KRW Opens in a new window
- ○남양마을 농로 정비(L=30m,B=3m,H=3m) 30,000,000 KRW Opens in a new window
- ○덕촌마을 안길 재포장(L=500m,B=3~6m) 20,000,000 KRW Opens in a new window
- ○령서마을 농로 확장(L=100m, B=2m→3m) 30,000,000 KRW Opens in a new window
- ○령동마을 농로 재포장(L=200m, B=4m) 30,000,000 KRW Opens in a new window
- ○외봉촌마을 노후 안길 정비(L=70m, B=3m) 30,000,000 KRW Opens in a new window
- ○내봉촌 봉연암들 배수로 정비(L=90m, D=1000mm) 30,000,000 KRW Opens in a new window
- ○유계마을 쉼터 정비(정자1식) 30,000,000 KRW Opens in a new window
- ○단계마을 배수로 설치 외 1개소(L=60m, D=500mm) 30,000,000 KRW Opens in a new window
- ○상촌마을 배수로 정비(L=100m, D=1,000mm) 30,000,000 KRW Opens in a new window
- ○어연마을 농로 정비(포장 A=160㎡) 30,000,000 KRW Opens in a new window
- ○가동마을 안길 안전난간 설치 (L=100m, H=1m) 20,000,000 KRW Opens in a new window
- ○영동마을 농로 정비(L=70m, B=4m / L=50m, D=50 30,000,000 KRW Opens in a new window
- ○동태마을 안길 확포장(L=50m, H=4m/L=50m, B=4m) 30,000,000 KRW Opens in a new window
- ○상촌마을 배수로 확장(L=70m,D=600mm) 30,000,000 KRW Opens in a new window
- ○어연마을 배수로 정비(L=150m, D=500mm) 30,000,000 KRW Opens in a new window
- ○영동마을 과수 농로 포장(L=100m, B=2m) 30,000,000 KRW Opens in a new window
- ○화천마을 용수공급관로 설치(L=500m, D=200mm) 40,000,000 KRW Opens in a new window
- ○성호마을 농로 정비(L=80m, B=2m) 20,000,000 KRW Opens in a new window
- ○내봉촌마을 교량정비 20,000,000원 20,000,000 KRW Opens in a new window
Data source
-
Open source PDF
경상남도 함안군 · FY2026 1회 추경 · 통합회계 · FY2026 예산서(경남 함안군)
Opens in a new window
- Page
- 804 / 816
- Document ID
doc_3keastps42j1e5m3cvdp3d85xx- Source document status
- Available
- File type
- application/pdf
- File size
- 13,881.178 KiB
- Location inside the source
- Page 804 Row 2 Line 21 Column level5
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 12:20
- Read and interpreted
- 2026-07-29 12:20
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_3h02bfk10x4v5d44em8qse2vdh- Address of this item
- /en/BudgetDetail/Item/bi_3h02bfk10x4v5d44em8qse2vdh
Related records
Similar budgets
5 itemsKeyword “600mm” · classification 401-01
- ○아산마을 과수농로 배수로 정비(L=120m, D=600mm) 30,000,000 KRW
- ○상촌마을 배수로 확장(L=70m,D=600mm) 30,000,000 KRW
- ○상촌마을 배수로 확장(L=70m,D=600mm) 30,000,000 KRW
- ㅇ적성3리(52) 배수로 설치공사(B=600mm, L=50m) 30,000,000 KRW
- ㅇ적성1리(1137) 배수로 설치공사(B=600mm, L=100m) 30,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.