- Institution
- 충청남도 홍성군
- Department
- 갈산면
◎노동마을 배수로정비(L=400m)
Programme 소규모 주민 숙원 사업 추진
Amounts and period
- Budgeted amount
- 350,000 KRW
- 기정액
- 0 KRW
- Change
- +350,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 갈산면 2,093,073,000 KRW0.0%
-
Policy 갈산면 주민숙원사업 522,000,000 KRW0.1%
-
Programme 소규모 주민숙원사업 처리 522,000,000 KRW0.1%
-
Project 소규모 주민 숙원 사업 추진 220,000,000 KRW0.2%
-
Budget category 시설비및부대비 220,000,000 KRW0.2%
-
Statistical item 시설부대비 2,000,000 KRW17.5%
-
Item ◎노동마을 배수로정비(L=400m) 350,000 KRW
- Category–statistical code
- 401-03
- Group
- Not provided in source
Original description
35,000,000원*1/100
Institution and programme names are shown as the original Korean source text.
Detailed budget items
7 items- ◎노동마을 배수로정비(L=400m) 350,000 KRW Opens in a new window
- ◎취생마을 아스콘덧씌우기(L=500m) 29,700,000 KRW Opens in a new window
- ◎노동마을 배수로정비(L=400m) 34,650,000 KRW Opens in a new window
- ◎운곡마을 농로포장(L=120m) 34,650,000 KRW Opens in a new window
- ◎목과마을 농로포장(L=150m, B=3m) 20,000,000 KRW Opens in a new window
- ◎취생마을 아스콘덧씌우기(L=500m) 300,000 KRW Opens in a new window
- ◎운곡마을 농로포장(L=120m) 350,000 KRW Opens in a new window
Data source
-
Open source PDF
충청남도 홍성군 · FY2019 1회 추경 · 일반회계 · 49-02.세출예산사업명세서(갈산면)
Opens in a new window
- Page
- 1 / 2
- Document ID
doc_12sex70s73wkkmahwjexdrx9dw- Source document status
- Available
- File type
- application/pdf
- File size
- 94.449 KiB
- Location inside the source
- Page 1 Row 25 Line 3 Column level4
Source and reference
FY 2019 release No source record
- Fiscal year of record
- 2019
- Fetched from the source
- 2026-07-29 18:03
- Read and interpreted
- 2026-07-29 18:03
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_3hc2jyh048pt42v2c1f0dhr5y8- Address of this item
- /en/BudgetDetail/Item/bi_3hc2jyh048pt42v2c1f0dhr5y8
Related records
Similar budgets
Keyword “배수로정비” · classification 401-03
No items with the same classification were found among the candidates checked.
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.