- Institution
- 경기도 평택시
- Department
- 건설도로과
○시도6호선(안중~내탑사거리) 도로확포장공사
Programme 시도6호선(안중~내탑사거리) 도로확포장공사
Amounts and period
- Budgeted amount
- 120,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설도로과 33,421,973,000 KRW0.4%
-
Policy 지방도 건설 및 확포장 32,957,987,000 KRW0.4%
-
Programme 신속하고 편리한 도로망구축 23,670,000,000 KRW0.5%
-
Project 시도6호선(안중~내탑사거리) 도로확포장공사 120,000,000 KRW100.0%
-
Budget category 시설비및부대비 120,000,000 KRW100.0%
-
Statistical item 시설비 120,000,000 KRW100.0%
-
Item ○시도6호선(안중~내탑사거리) 도로확포장공사 120,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○시도6호선(안중~내탑사거리) 도로확포장공 사 120,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 평택시 · FY2026 본예산 · 통합회계 · FY2026 예산서(경기 평택시)
Opens in a new window
- Page
- 575 / 1,127
- Document ID
doc_1crpswseggwfnzg40v99h6fraj- Source document status
- Available
- File type
- application/pdf
- File size
- 12,095.01 KiB
- Location inside the source
- Page 575 Row 19 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 20:38
- Read and interpreted
- 2026-07-29 20:38
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_3hjqx68zn2bvqp2ym7xg0ae6wm- Address of this item
- /en/BudgetDetail/Item/bi_3hjqx68zn2bvqp2ym7xg0ae6wm
Related records
Similar budgets
5 itemsKeyword “도로확포장공사” · classification 401-01
- ○성산103호(산북리 일원) 도로확포장공사 50,000,000 KRW
- ○왕림~분천간 도로확포장공사 1,000,000,000 KRW
- ◎문의 도원리(2공구) 도로확포장공사 10,000,000 KRW
- ○지화리 도로확포장공사 공사추진비 1,000,000,000 KRW
- ○시도57호선 도로확포장공사 100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.