- Institution
- 충청북도 청주시
- Department
- 도로사업본부지역개발과
◎가공배전선로 지중화사업(L=500m)
Programme 가공배전선로 지중화사업
Amounts and period
- Budget amount
- 898,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로사업본부지역개발과 17,635,375,000 KRW5.1%
-
Policy 시민친화형도로교통기반조성 17,268,520,000 KRW5.2%
-
Programme 녹색교통기반조성 3,318,080,000 KRW27.1%
-
Project 가공배전선로 지중화사업 898,000,000 KRW100.0%
-
Budget category 자치단체등자본이전 898,000,000 KRW100.0%
-
Statistical item 공기관등에대한자본적위탁사업비 898,000,000 KRW100.0%
-
Item ◎가공배전선로 지중화사업(L=500m) 898,000,000 KRW
- Category–statistical code
- 403-02
- Group
- Not provided in source
Original description
898,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
View source document details
- Document ID
doc_79phkk0wtb690tk9edpwvpkggy- Source document status
- Available
- File type
- application/pdf
- File size
- 364.152 KiB
- Location inside the source
- Page 7 Row 8 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 18:33
- Read and interpreted
- 2026-07-29 18:33
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_3pmj27v00vvf02r0m0pnyn32cb- Address of this item
- /en/BudgetDetail/Item/bi_3pmj27v00vvf02r0m0pnyn32cb
Related records
Similar budgets
4 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “가공배전선로” · classification 403-02
- ○둔방내리 가공배전선로 지중화사업 1,000,000,000 KRW
- ○ 가공배전선로 지중화사업(한전) 62,766,000 KRW
- ○비자림로 가공배전선로 지중화사업 3,600,000,000 KRW
- ○가공배전선로 삼상화 사업(한전) 지자체 부담금 40,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.